The At Risk Register
The Register
Explore buildings on the register by selecting the district below. At risks sites are listed in alphabetical order by parish. Click on each ‘at risk’ site for more information about its location and status.
PLEASE NOTE: Not all areas have been surveyed yet, so some areas will have fewer ‘at risk’ sites listed than others. These will be added as more areas are surveyed, so check back regularly for updates.
See more information about the register itself at the link below.
District: Ashfield
Annesley Hall
Site Name: Annesley Hall
Grade: II
Parish: Annesley
Overall Condition:
NCC Risk Category: NA
Historic England assessment:
The Hall (Grade II) suffered a serious fire in May 2015. An options appraisal and parkland management plan have been completed to help develop a sustainable future for the site and secure its conservation. Options for implementation are being explored. Historic England has provided advice. (HE 2020)
NCC Survey Date: NA
District: Bassetlaw
Church of All Saints, Beckingham

Site Name: Church of All Saints, Church Street
Parish: Beckingham
Grade: II*
Overall Condition: Poor (HE)
NCC Risk Category: NA
Historic England assessment:
Cracking appeared in the chancel several years ago. Technical advice has been obtained and stabilisation of the fabric is needed. The below ground drainage has been investigated and a new system and soakaway has been installed. Repair works to address the instability of the fabric got underway in 2019. (HE 2020)
NCC Survey Date: NA
Church of St Giles, Darlton

Site Name: Church of St Giles
Parish: Darlton
Grade: II*
Overall Condition: Very Bad (HE)
NCC Risk Category: NA
Historic England assessment:
The building has suffered from widespread structural movement with vertical cracks to several elevations. The tiled roofs have numerous defects and the junction between nave and chancel is open to the elements, allowing water to penetrate the building. Rainwater goods are defective, Self-set trees in the valley gutter between the north vestry and chancel. There are blocked hoppers elsewhere, and smashed windows. (HE 2020)
NCC Survey Date: NA
Church of St Giles, Carburton
Site Name: Church of St Giles, Piper Lane
Parish: Carburton
Grade: II*
Overall Condition: Poor (HE)
NCC Risk Category: NA
Historic England assessment:
Externally the church has a cementitious render coat and there is evidence of structural movement to the east end gable. Nave roof covering appears functional. Vestry roof and rainwater goods are in need of repair. Water ingress internally has caused damage to the plasterwork and ceiling panels. The church is currently closed for worship. (HE 2020)
NCC Survey Date: NA
Church of St. Oswald

Site Name: Church of St. Oswald
Grade: I
Parish: Dunham-on-Trent
Overall Condition: Very Bad (HE)
NCC Risk Category: NA
Historic England assessment:
There are serious concerns about the tracery work to the very large belfry openings, and the structural integrity is severely compromised in several places. There are localised stonework defects elsewhere. The slated roofs, gutters and downpipes are all in very poor condition. Water ingress is evident in numerous places. (HE 2020)
NCC Survey Date: NA
Church of St Peter and St Paul

Site Name: Church of St Peter and St Paul, North Green
Grade I
Parish: East Drayton
Overall Condition: Poor (HE)
NCC Risk Category: NA
Historic England assessment:
Extensive works recently completed to nave roof and medieval timber structure under a National Lottery Heritage Fund Grant for Places of Worship grant. South aisle also repaired in 2015 with grant from the Listed Places of Worship Roof Repair Fund. Repairs still needed to the leaking north aisle. (HE 2020)
NCC Survey Date: NA
Church of St John the Baptist

Site Name: Church of St John the Baptist, Church Street
Grade: I
Parish: East Markham
Overall Condition: Poor (HE)
NCC Risk Category: NA
Historic England assessment:
The church was subject to heritage crime in 2019. The parish is keen to effect repairs and have sought the advice of the diocese, the conservation officer at the local authority and Historic England. (HE 2020)
NCC Survey Date: NA
Church of St Peter

Site Name: Church of St Peter
Grade: I
Parish: Gamston
Overall Condition: Poor (HE)
NCC Risk Category: NA
Historic England assessment:
The nave roof south gutter has failed and water ingress over several years has penetrated the wall head. Internally, the south aisle and tower plaster work has been removed to facilitate drying of the fabric. There is a pervasive damp problem at low level. Some structural issues exist at the stair turret junction with the nave. The Churches Conservation Trust completed a repair project in early 2019 to address some of these issues. Further repairs are planned. (HE 2020)
NCC Survey Date: NA
Hodstock Priory Gatehouse

Site Name: Hodstock Priory Gatehouse
Parish: Hodstock
Grade I
Overall Condition: Fair (HE)
NCC Risk Category: NA
Historic England assessment:
Whilst the house is occupied and used as a wedding venue, the gatehouse is unused and requires
comprehensive maintenance. Historic England has encouraged the development of options for reuse of the gatehouse combined with full repair of the structure.
Following the commissioning of a condition survey, essential repairs have now been carried out. A bid to the National Lottery Heritage Fund for an educational and restoration project has been considered. (HE 2020)
NCC Survey Date: NA
Church of All Saints

Site Name: Church of All Saints, Church Street
Grade I
Parish: Misterton
Overall Condition: Poor (HE 2020)
NCC Risk Category: NA
Historic England assessment:
The north aisle has suffered from structural movement and defective ground drainage is suspected. Further investigation into the cause of the movement is needed before repairs are implemented. North aisle buttresses are unstable in places and there is a need for repointing once movement has stabilised. The tower stonework at belfry stage is open jointed and localised repair is needed. (HE 2020)
NCC Survey Date: NA
Church of St Matthew

Site Name: Church of St Matthew, Main Street
Grade II*
Parish: Normanton on Trent
Overall Condition: Poor (HE 2020)
NCC Risk Category:
Historic England assessment:
The church was subject to heritage crime in 2019 and the interior suffered from water ingress. The interior remains damp. The tower roof is nearing the end of its life. Some pointing and isolated masonry repairs are required. The church undertook a programme of repairs in early 2020 and are keen to undertake further repairs once funds are available. (HE 2020)
NCC Survey Date: NA
Gateway and Walls from Manor Farm to churchyard

Site Name: Gateway and Walls from Manor Farm to churchyard
Grade I
Parish: Rampton
Overall Condition: Poor (HE 2020)
NCC Risk Category: NA
Historic England assessment:
Stonework on the south face is very eroded, particularly on decorative plaques and lintel above the gateway; repair is needed. The north face (including plaques) is less eroded, but repointing also needed. The mortar joints to the brick wall are now deeply recessed and in need of repointing. Ivy growth is extensive to walls in particular, and is displacing stone copings. (HE 2020)
NCC Survey Date: NA
Methodist Church, Grove Street
Site Name: Methodist Church, Grove Street
Grade II
Parish: Retford (East Retford)
Overall Condition: Poor (HE 2020)
NCC Risk Category:
Historic England assessment:
Part of a plaster ceiling fell in 2014, requiring the closure of the main part of the building. Investigations early in 2015 into the ceiling structure have revealed the likely cause of the problem. In addition, there are concerns about structural movement to the stair tower and this is being monitored. Below ground drainage works may be needed if found to be contributing to movement. (HE 2020)
NCC Survey Date: NA
Church of St Swithun

Site Name: Church of St Swithun,
Churchgate
Grade: II*
Parish: Retford (East Retford)
Overall Condition: Poor (HE 2020)
NCC Risk Category: NA
Historic England assessment:
The church has been suffering from many leaks. Nave and aisle roof coverings were repaired with a National Lottery Heritage Fund grant in 2010 and a second phase of repairs to transept roofs and tower was completed in 2014. Further roofing and masonry repairs still urgently required in other areas, and this will be carried out as funding allows. The church has been subject to heritage crime. (HE 2020)
NCC Survey Date: NA
Parish Church of St Michael the Archangel
Site Name: Parish Church of St Michael the Archangel, Bridgegate.
Grade: II*
Parish: Retford (West Retford)
Overall Condition: Poor (HE 2020)
NCC Risk Category: NA
Historic England assessment:
Masonry is generally in fair condition but there are poor parapet abutment details
and various localised repairs are evident. There is significant
erosion of jamb stones and jointing to south porch arch
and gable. Roof coverings leak at abutments and there is
water ingress damage internally. A Listed Places of Worship Roof Repair Fund grant enabled roofs and rainwater goods to be repaired in 2016. Other work is
needed. (HE 2020)
NCC Survey Date: NA
East Stable and Outbuildings at Shireoaks Hall

Site Name: East Stable and Outbuildings at Shireoaks Hall
Grade II*
Parish: Shireoaks
Overall Condition: Very Bad (HE 2020)
NCC Risk Category:
Historic England assessment:
There are many slipped , broken and displaced slates on the roof. Masonry is open jointed, cracked and displaced particularly in locations where the downpipes used to be. The building is shrouded in vegetation and a self-set sapling is growing through the roof. The outbuildings are in a ruinous state. (HE 2020)
NCC Survey Date: NA
Shireoaks Hall

Site Name: Shireoaks Hall
Grade II*
Parish: Shireoaks
Overall Condition: Very Bad (HE 2020)
Risk Category:
Historic England assessment:
The hall has been much altered historically and there are a number of significant cracks. There is some loose stonework at high level with some sections at risk of imminent collapse. Roofs are in poor condition. The rainwater disposal is ineffective and undersized. The north elevation is shrouded in vegetation. The outbuildings are partially collapsed. Internally, some areas of ceiling plaster have failed. (HE 2020)
NCC Survey Date: NA
West Stable and Outbuildings at Shireoaks Hall

Site Name: West Stable and Outbuildings at Shireoaks Hall
Grade II*
Parish: Shireoaks
Overall Condition: Very Bad (HE 2020)
Risk Category:
Details: A pair to the East Stable. There are many slipped , broken and displaced slates on the roof. Past slate repairs are now failing and the north ridge is missing. Masonry is open jointed, cracked and displaced particularly in locations where the downpipes used to be. The stable and outbuildings are shrouded in vegetation. (HE 2020)
Survey Date: NA
Arch at Serlby Park

Site Name: Arch at Serlby Park
Parish: Styrrup with Oldcoates
Grade II*
Overall Condition: Poor (HE 2020)
Risk Category:
Details: The stonework is heavily eroded in places, particularly to the southern elevation and the voussoirs. There is extensive open mortar jointing across most elevations. Self-seeded trees require removal, however extensive ivy growth has been removed and cleared from the vicinity of the structure. (HE2020)
Survey Date:
Worksop Priory Gatehouse

Site Name: Worksop Priory Gatehouse
Grade I
Parish: Worksop
Overall Condition:
Risk Category:
Details: The gatehouse requires comprehensive repair, as demonstrated by a condition survey funded by grant aid from Historic England. An initial body of repairs focusing on the shrine, funded by a Repair Grant for Places of Worship, was completed summer 2016. Further repairs are needed to the interior, exterior stonework, rainwater goods and statues. Options for future uses and funding possibilities are being explored. (HE 2020)
Survey Date:
Church of St. John
Site Name: Church of St. John, Gateford Road.
Grade II
Parish: Worksop
Overall Condition: Poor (HE assessment)
Risk Category: N/A (Not assessed by NCC)
Details: (Stone erosion at high level. Steeplejack inspection in 2021 revealed a range of defects inclusing some movement. (Source HE 2021)
Survey Date: Non NCC survey in 2021 source HE)
District: Broxtowe
Bennerley Viaduct

Site Name: Bennerley Viaduct, Awsworth
Road
Grade II*
Parish: Awsworth
Overall Condition:
Risk Category:
Details: Disused for decades, there was unchecked deterioration and a lack of maintenance. Historic England provided advice to inform consents for repairs and the construction of a foot/cycle path across the viaduct. An application to the National Lottery Heritage Fund in 2017 for this major project was not successful. Historic England awarded a two stage grant in January 2019; development work completed in 2019 and essential repairs commenced in March 2020. Work was temporarily stopped due to Covid-19 but re-started in May 2020.(HE 2020)
Survey Date:
Willoughby Alms-houses and adjoining Boundary Wall

Site Name: Willoughby Almshouses and
adjoining Boundary Wall,
Church Lane
Grade II*
Parish: Cossall
Overall Condition:
Risk Category:
Details: There are some open joints in the copings on the gables and at parapet level. The houses have been boarded up and would benefit from better ventilation. The interiors are suffering from damp and damp related issues. (HE 2020)
Survey Date:
Summerhouse at the Yews, Kimberly Road

Site Name: Summerhouse at the Yews, Kimberly Road
Grade II*
Parish: Nuthall
Overall Condition:
Risk Category:
Details: Significant vegetation growth around and over roofs into upper gutters. Loss of roof covering allowing structural timber decay and localised instability in decayed masonry, particularly the rear gable masonry which is at risk of collapse if continued water ingress is not prevented.(HE 2020)
Survey Date:
District: Newark and Sherwood
Overall Condition: Very Bad
Blidworth Windmill

Site Name: Blidworth Windmill
Parish: Blidworth
Overall Condition: Very Bad
Risk Category: 1
Details: Top courses of bricks missing. No roof, vegetation growing on the inside walls, render coming away, windows not glazed.
Survey Date: 09.06.2017
Pigeoncote at Willingham House

Site Name: Pigeoncote at Willingham House
Parish: Cromwell
Overall Condition: Very Bad
Risk Category: 1
Details: Roof removed and gables taken down. Climbing plant to NW corner and over tarp and upper courses of bricks. Silver birch tree close to northern wall.
Survey Date: 09.11.2017
Sundial 5 metres South of South Transept of Church of St Mary, Tuxford Road
Site Name: Sundial 5 metres South of South Transept of Church of St Mary, Tuxford Road
Parish: Egmanton
Overall Condition: Very Bad
Risk Category: 1A
Details: 2013 photo shows none of the problems encountered in 2017. Sundial has collapsed and top section has fallen off and is in 3 pieces and appear to lay where they fell. Standing section of the stone shaft is flaking and eroded. Climbing plants to the base. Remains of upright scattered around base. Base stones are coming apart from each other, possible due to ivy growth.
Survey Date: 15.06.2017
Gypsum Grinding Mill

Site Name: Gypsum Grinding Mill
Parish: Hawton
Overall Condition: Very Bad.
The building was delisted on 28.01.2025.
Risk Category: 1
Details: In a roofless derelict state. No doors or windows. Large part of the walls missing.
Survey Date: 23.06.2017
Mile Stone, Mansfield Road
Site Name: Mile Stone, Mansfield Road
Parish: Hockerton
Overall Condition: Very Bad
Risk Category 1A
Details: Missing
Survey Date: 09.06.2017
Railing and Gate at No 6, Main Street

Site Name: Railing and Gate at No 6, Main Street
Parish: Kelham
Overall Condition: Very Bad
Risk Category: 1A
Details: Railings almost completely obscured and within conifer hedge. The bottom of the railings are visible in places and where they can be seen are in a very bad state and have completely corroded leaving gaps between the uprights and the bottom rail.
Survey Date: 02.06.2017
Beacon Hill Tollhouse

Site Name: Beacon Hill Tollhouse, Beacon Hill Road
Parish: Newark
Overall Condition: Very Bad
Risk Category: 1
Details: Part demolished. Windows boarded and infilled. Rainwater goods failing.
Date: 28.07.2017
Boundary Wall and Gate at Church of the Holy Rood

Site Name: Boundary Wall and Gate at Church of the Holy Rood, Church Lane
Parish: Ossington
Overall Condition: Very Bad
Risk Category: 1A
Details: SE end is being pushed forward by the earth and ivy it is retaining. Covered almost to the base with ivy. SE end starting to collapse and bricks loose. Very deeply recessed mortar in places. Erosion to bricks either side of the gateway. Large Laurel NW of the gateway on the outside of the wall. Mature Sycamore tree on the inside at NW end.
Survey Date: 29.06.2017
Monumental Well at Ossington Hall
Site Name: Monumental Well at Ossington Hall, Grange Farm Lane
Parish: Ossington
Overall Condition: Very Bad
Risk Category: 1A
Details: Roof covered in part with moss. Terracotta freezes on exterior severely weathered some dentils missing. Capitals worn esp. on SE column. Algae growth to column bases. Base stones displaces and covered in moss. Overgrown and vegetation is overhanging. Interior nicely preserved.
Survey Date: 29.06.2017
Pillarbox Opposite Woodland View, The Lane
Site Name: Pillarbox Opposite Woodland View, The Lane
Parish: Perlethorpe cum Budby
Overall Condition: Very Bad
Risk Category: 1A
Details: Stolen, replacement in place but still wrapped in plastic.
Survey Date: 21.03.2017
Urn in Ice House Wood
Site Name: Urn in Ice House Wood
Parish: Perlethorpe cum Budby
Overall Condition: Very Bad
Risk Category: 1A
Details: Not Located. Area landscaped
Survey Date: 24.11.2017
Ice House on Island at East end of Lake
Site Name: Ice House on Island at East end of Lake
Parish: Perlethorpe cum Budby
Overall Condition: Very Bad
Risk Category: 1A
Details: Not located. Area now landscaped.
Survey Date: 24.11.2017
Garden Urn at Castle View
Site Name: Garden Urn at Castle View, Main Street
Parish: Perlethorpe cum Budby
Overall Condition: Very Bad
Risk Category: 1A
Details: Missing as in 2003 survey.
Survey Date: 24.11.2017
Sundial 150 metres south of Thoresby Hall
Site Name: Sundial 150 metres south of Thoresby Hall
Parish: Perlethorpe cum Budby
Overall Condition: Very Bad
Risk Category: 1A
Details: Removed, missing
Survey Date: 24.11.2017
South Lamp at West Gate at Church of St. John
Parish: Perlethorpe cum Budby
Overall Condition: Very Bad
Risk Cat: 1A
Site Name: South Lamp at West Gate at Church of St. John
Details: In 2003 – In two pieces on the floor next to gate, heavily corroded. In 2017 – Reused as flagpole base.
Survey Date: 24.11.2017
Ruins of Old Church in Churchyard, Top Road
Site Name: Ruins of Old Church in Churchyard, Top Road
Parish: Thorney
Overall Condition: Very Bad
Risk Category: 1A
Details: Arch no. 1 is virtually destroyed, remains covered with ivy. Arches no. 2 and 3 recently restored although some stone flaking on arch no. 3. ‘At risk’ only applies to arch no. 1.
Survey Date: 24.08.2013
Triple and Single Chest Tombs 2 metres South of Chancel at Church of St Swithin

Site Name: Triple and Single Chest Tombs 2 metres South of Chancel at Church of St Swithin, Potter Lane
Parish: Wellow
Overall Condition: Very Bad
Risk Category: 1A
Details: The third of the triple chest tomb closest to the church has been dismantled or knocked down and is laid upside down. The ground beneath is disturbed. South face of the tomb is badly eroded. The single chest tomb has ivy growing on it and the inscription is still visible. Possible inscription on long side worn away. One tomb has side missing and is open.
Survey Date: 18.07.2017
Stable Block at Winkburn Hall
Site Name: Stable Block at Winkburn Hall, Winkburn Hall Drive
Parish: Winkburn
Overall Condition: Very Bad
Risk Category: 1A
Details: Large areas of brickwork need pointing. Downpipes blocked and causing staining to brickwork etc. Windows missing, many without glass or have broken panes, door missing to south west elevation. Crack south west elevation over window
Survey Date: 08.03.2014
Overall Condition: Poor
Windmill at Mill Farm
Site Name: Windmill at Mill Farm, Sand Lane
Parish: Besthorpe
Overall Condition: Poor
Risk Category: 3
Details: Brickwork in poor condition. Missing bricks and stepped cracking.
Survey Date: 09.11.2017
Row of 8 Headstones and Memorial Cross 15 metres South of the Church of St Mary of the Purification

Site Name: Row of 8 Headstones and Memorial Cross 15 metres South of the Church of St Mary of the Purification, Main Street
Parish: Blidworth
Overall Condition: Poor
Risk Category: 3A
Details: Algae and moss growing on both the cross and headstones. One stone partly legible, and two are covered in moss and illegible.
Survey Date: 09.06.2017
Friar Tuck’s Well

Site Name: Friar Tuck’s Well, Black Scotch Lane
Parish: Blidworth
Overall Condition: Poor
Risk Category: 3A
Details: The well located to the side of the cascade and is now buried. The railings are no longer in place.
Survey Date: 09.06.2017
Gateway 8 metres North East of the Church of St Mary of the Purification

Site Name: Gateway 8 metres North East of the Church of St Mary of the Purification, Main Street
Parish: Blidworth
Overall Condition: Poor
Risk Category: 3A
Details: Stone badly eroded on lintel on road side and on inside of piers. Gates in fair order painted but rusting slightly where cracks have appeared.
Survey Date: 09.06.2017
Flight of Steps and Gateway at Fountain Dale House

Site Name: Flight of Steps and Gateway at Fountain Dale House, 40 metres South East of the House, Ricket Lane
Parish: Blidworth
Overall Condition: Poor
Risk Category: 3A
Details: Wrought iron railings in poor condition. Very overgrown to the west side. Gates and metal work has peeling paint and is rusting. Stone gate piers in fair order with moss to the obelisks.
Survey Date: 09.06.2017
Row of 17 Headstones 2 metres East of the Chancel of Church of St Mary of the Purification

Site Name: Row of 17 Headstones 2 metres East of the Chancel of Church of St Mary of the Purification, Main Street
Parish: Blidworth
Overall Condition: Poor
Risk Category: 3A
Stones 10th and 12th from the road end completely covered in moss. Legibility of inscriptions varies from fair to very bad.
Survey Date: 09.06.2017
Boundary Wall, Gate Piers and Gates at Carlton Hall

Site Name: Boundary Wall, Gate Piers and Gates at Carlton Hall, Church Street
Parish: Carlton on Trent
Overall Condition: Poor
Risk Category: 3A
Details: Areas of spalling and salts present. Deeply recessed bricks and larges patches of lichen growth. The gate to the north is damaged and missing a section at the base. Deeply eroded brickwork due to water from lean to shed. Bulging in places. Substantial crack and bulging caused by Buddleia. One section has been replaced by breeze blocks. Large crack to corner and missing capstones.
Survey Date: 15.06.2017
Headstocks and Powerhouse at the Site of the Former Clipstone Colliery

Site Name: Headstocks and Powerhouse at the Site of the Former Clipstone Colliery
Parish: Clipstone
Overall Condition: Poor
Risk Category: 3
UPDATE:Headstocks and topple zone sold to Adco Properties Ltd in Dec 2020. New owners are actively tackling safety maintenance and clearing up jobs. Future works planned to make roofs watertight and re-glaze the engine house. Owners in active discussions with stakeholders regarding funding bids and future public access. JM March 2021
Details: Broken windows. Mature vegetation growing from roof and walls.
Survey Date: 21.07.2017
Station House

Site Name: Station House, Station Road
Parish: Collingham
Overall Condition: Poor
Risk Category: 3
Details: Canopies missing above pillars and arcades. Broken windows in central and east bay are boarded. Brickwork cracked below central bay window. Breeze block in filled windows to side of central bay.
Survey Date: 21.03.2018
House adjoining the Cross Shop

Site Name: House adjoining the Cross Shop, High Street
Parish: Collingham
Overall Condition: Poor
Risk Category: 3
Details: Windows rotten and boarded. Latticework porch broken at the base. Rainwater good in poor condition with evidence of damp to brickwork. Shop front rotten and coming away from wall. Roof of adjoining shed falling in.
Survey Date: 21.03.2018
Group of 4 Chest Tombs in Churchyard 2 metres South of Church of St Oswald

Site Name: Group of 4 Chest Tombs in Churchyard 2 metres South of Church of St Oswald, School Lane
Parish: East Stoke
Overall Condition: Poor
Risk Category: 3A
Details:
Tomb 1: Illegible inscription and west end stone missing. North face is damaged to the east corner.
Tomb 2: All sides intact.
Tomb 3: East side stone has fallen open and leans up against tomb 4. Tomb 4: Inscription partly legible. Sinking to the east end and leaning to the south.
Survey Date: 23.06.2017
Pair of Head Stones in Church Yard of Church of St Giles

Site Name: Pair of Head Stones in Church Yard of Church of St Giles 5 metres North of the Chancel, Main Street
Parish: Edingley
Overall Condition: Poor
Risk Category: 3A
Details: Partly legible. Both stone reduced in size to just leave the date. Both stones have sunk.
Survey Date: 02.06.2017
Springs Farm Barn and Mill
Site Name: Springs Farm Barn and Mill, Station Road
Parish: Edingley
Overall Condition: Poor
Risk Category: 3
Details: Roofs have substantial moss growth and a few slipped tiles. Rainwater goods broken and missing and vegetation growing in gutters. Door rotten with lower parts of the timber removed and left open. Stone steps on brick, brickwork showing signs of cracking with some crude cement repointing. Some spalling next to steps. Windows to attached building have many broken panes of glass and many ridge tiles missing. Walls overgrown with ivy.
Survey Date: 02.06.2017
Monument to a Horse
Site Name: Monument to a Horse, Worksop Road
Parish: Edwinstowe
Overall Condition: Poor
Risk Category: 3A
Details: Ball finial missing and capital missing large chunk. Column is pockmarked and any original ‘signature’ inscription has disappeared. Some etched graffiti.
Survey Date: 09.11.2017
Edwinstowe Hall

Site Name: Edwinstowe Hall, Church Street
Parish: Edwinstowe
Overall Condition: Poor
Risk Category: 3
Details: Render is coming away in places, especially on chimneys and near roof. Sash windows peeling. Mature vegetation growing through lean to roof. Mature vegetation growing out of wall and filling gutters and hoppers.
Survey Date: 21.07.2017
Barn and attached Outbuilding at the Old House

Site Name: Barn and attached Outbuilding at the Old House, Main Street
Parish: Epperstone
Overall Condition: Poor
Risk Category: 3
Details: Outbuilding roof missing tiles and undulating. Lack of guttering on main barn and blocked guttering on outbuilding. Walls – Some missing pointing, small areas of spalling. Vegetation growing against south wall. Spray/salt damage along roadside wall. Some rot at top of double door.
Survey Date: 01.06.2017
Sundial in Church Yard of Church of St Michael
Site Name: Sundial in Church Yard of Church of St Michael, 7 metres South of the South East Aisle, Main Street
Parish: Farnsfield
Overall Condition: Poor
Risk Category: 3A
Details: Upright only remains, showing significant lichen growth on the south side. Surface of the stone has lifted and will fall away if touched.
Survey Date: 02.06.2017
The Pinfold, Copper Hill

Site Name: The Pinfold, Copper Hill
Parish: Grassthorpe
Overall Condition: Poor
Risk Category: 3A
Details: Deeply recessed mortar in places and some loose bricks. Loose coping stones. Crack to the SE corner. Climbing plants up inside of walls.
Survey Date: 15.06.2017
Mill and attached House and Bridge

Site Name: Mill and attached House and Bridge, Halam Hill
Parish: Halam
Overall Condition: Poor
Risk Category: 3
Details: Mill wheel and pit in poor condition. Vegetation around mill wheel is affecting the structure. Windows rotten through and mill door base and timber lintel have rotten. Bridge accessible but overgrown. Mill building overshadowed by very close growing and dense vegetation. House: Rainwater goods broken. Roof sagging and a few slipped tiles.
Survey Date: 09.06.2017
Church of St. Nicholas

Site Name: Church of St. Nicholas, Church Lane
Parish: Hockerton
Overall Condition: Poor
Risk Category: 3
Details: Guttering damaged in all locations and full of vegetation. East chancel wall severe subsidence crack. West door stone eroded. Vegetation growing from buttress on S side of nave. S porch gutter failed and causing deterioration of stone on west side of porch. Very overgrown to the north side of the church causing shade, walls here covered in algae and ivy. Moss to north inside of chancel roof.
Survey Date: 09.06.2017
Stable Block to the West and Slightly North of Holme Hall

Site Name: Stable Block to the West and Slightly North of Holme Hall, Main Street
Parish: Holme
Overall Condition: Poor
Risk Category: 3
Details: Gutters filled with mature vegetation, cracked in places and hanging down in other places. Brickwork to NW corner badly eroded to the lower courses. Needs rainwater good maintaining to prevent further deterioration. Currently part of stable yard.
Survey Date: 23.06.2017
Village Cross
Site Name: Village Cross, Main Street
Parish: Holme
Overall Condition: Poor
Risk Category: 3A
Details: Just over a foot remains of the upright plus the base. Covered in lichen growth. Base cracked and section missing on the north edge. What remains appears stable as no discernible change from 1984 photo.
Survey Date: 23.06.2017
Seven Garden Urns at Kelham Hall
Site Name: Seven Garden Urns at Kelham Hall, Averham Road
Parish: Kelham
Overall Condition: Poor
Risk Category: 3A
Details: Numbered from east to west: 1)(poor) large chunk of terracotta (cable mould) missing beneath bowl face. 2) (fair)several perpendicular cracks on terracotta 3) (fair)loose piece and corner piece missing 4) (poor)repair is ugly, bowl has a lot of cracks 5) (poor)bowl good, bowl and middle is unstable, cement repairs are ugly 6) (poor)concrete has weathering, bowl lugs damaged 7) (good)rose detail, incrustation, bowl intact, best condition out of all urns.
Survey Date: 02.06.2017
36 Railing Piers at Kelham Hall

Site Name: 36 Railing Piers at Kelham Hall, Main Street
Parish: Kelham
Overall Condition: Poor
Risk Category: 3A
Details: Piers numbered from west (river Trent end) to east. Ivy on piers 1, 3, 18, 19, 21, 24 and 26. Brickwork loose and/or missing piers 8,9,16,23 and 25. Pier 13 is twisted. Pier 7 shows deeply recessed pointing to the lower half.
Survey Date: 02.06.2017
Ivy Farmhouse and Cottage

Site Name: Ivy Farmhouse and Cottage, Newark Road
Parish: Kirklington
Overall Condition: Poor
Risk Category: 3
Details:
Severe subsidence crack to south wall. SW corner of building rebuilt following vehicle impact. Vegetation goring up and close to front elevation. Window and door frames rotten and paint peeling, timber of fan light rotting. Gutter broken and hanging off. Railings are rusty and need painting. Gate bent out of shape.
Survey Date: 09.06.2017
Cross 12 metres South of Church of St Michael
Site Name: Cross 12 metres South of Church of St Michael, Main Street
Parish: Laxton and Moorhouse
Overall Condition: Poor
Risk Category: 3A
Details: Top section and half of the shaft is cracked through and repaired. Stone of shaft is flaking. Base stones separating, some ivy growth and covered in moss to the NW side.
Survey Date: 21.07.2017
Barn at Brockilow Farmhouse
Site Name: Barn at Brockilow Farmhouse, off Kersall Road
Parish: Laxton and Moorhouse
Overall Condition: Poor
Risk Category: 3
Details: Cracked/missing ridge mortar. Wall damaged to, probably hit by farm vehicle. Tiles lifting at north end of roof, missing tiles to the rear. Gutter missing in places and falling away in others. Vents blocked. Loose brickwork under eaves at rear of barn.
Survey Date: 21.07.2017
Old Bar Farmhouse

Site Name: Old Bar Farmhouse, Bar Road
Parish: Laxton and Moorhouse
Overall Condition: Poor
Risk Category: 3
Details: West gable end has ivy growing to second floor level. Areas of deeply recessed mortar to lower courses. East gable end ivy growing. Brickwork and eaves sagging over east window, crack runs from this window to the ground floor. Windows rotten.
Survey Date: 21.07.2017
Gate Piers and Gate at Church of St Michael

Site Name: Gate Piers and Gate at Church of St Michael, Main Street
Parish: Laxton and Moor House
Overall Condition: Poor
Risk Category: 3A
Details: Severely weathered stonework to gate piers. Railings in fair order but need painting.
Survey Date: 21.07.2017
8, London Road

Site Name: 8, London Road
Parish: Newark
Overall Condition: Poor
Risk Category: 3
Details: Colourwash stained. Evidence of damp above door hood. Down pipe corroded and split. Gutter blocked. Paint peeling off lower courses of the façade. Extensive peeling of window paint.
Survey Date: 28.07.2017
6 and 8, Portland Street

Site Name: 6 and 8, Portland Street
Parish: Newark
Overall Condition: Poor
Risk Category: 3
Details: Gutter full of vegetation and no downpipe. Ground floor windows boarded. Substantial crack to wall to the right of the central door. Paint peeling and neglected. Colour-washed render currently in a poor state.
Survey Date: 28.07.2017
Trent Bridge, Beast Market Hill

Site Name: Trent Bridge, Beast Market Hill
Parish: Newark
Overall Condition: Poor
Risk Category: 3A
Details: Damage to archway; stone damaged and evidence of breezeblock and cement repair. Packing underneath which was originally under cement now exposed and possibly loose. Stone work missing above one cut water. Vegetation growing to the cut waters and along metal work and piers. Extensive graffiti under archway over foot path. Worn and stained stonework.
Survey Date: 14.09.2017
37 and 39, Kirkgate

Site Name: 37 and 39, Kirkgate
Parish: Newark
Overall Condition: Poor
Risk Category: 3
Details: Render coming away from underside of jetty in St. Leonard’s Court passageway reed and plaster is exposed. Most windows boarded but one unbarred first floor window has 2 panes smashed.
Survey Date: 25.07.2017
Causeway Culvert 135 metres North West of Level Crossing

Site Name: Causeway Culvert 135 metres North West of Level Crossing, Great North Road
Parish: Newark
Overall Condition: Poor
Risk Category: 3A
Details: Large crack through the coping stone and down through the wall which is bulging away from the road. Sloping bricks under coping stones are badly damages. Brick to archway pillars eroded. Large tree growing out of south end and tree stump within brickwork at north end.
Survey Date: 04.08.2017
Causeway Arches and Embankment Walling 50 metres North West of Trent Bridge

Site Name: Causeway Arches and Embankment Walling 50 metres North West of Trent Bridge, Great North Road
Parish: Newark
Overall Condition: Poor
Risk Category: 3A
Details: Some mortar joints facing road have failed. Weathering to some sections of coping. Wrought iron gate and other metal work have minor corrosion fan grill to one side of the gate way is missing. Bricks severely eroded on car park side and some joints have no mortar and it is possible to see through to the other side. The tops of some buttresses are missing. Vegetation growing along the entire base of the wall on the car park side.
Survey Date: 25.09.2017
Former Corn Exchange

Site Name: Former Corn Exchange, Now Silverline Bingo, 18, Castlegate
Parish: Newark
Overall Condition: Poor
Risk Category: 3
Details: Water damage and vegetation present around moulded cornice. Glazing in tower cracked. Parts of stonework heavily stained with lower section becoming quite worn. NW and NE elevations – Rainwater good blocked. Windows smashed. Architectural detail worn.
Survey Date: 25.07.2017
Maltings 70 metres North West of Northgate Brewery

Site Name: Maltings 70 metres North West of Northgate Brewery, Northgate
Parish: Newark
Overall Condition: Poor
Risk Category: 3
Details: Doors infilled with breeze blocks. Rust staining to roof from metal finials. Bricks of the second floor decorative band are eroding. Glazing smashed, windows and doors have bars. Site well secured and for sale.
Survey Date: 28.07.2017
Farndon Windmill
Site Name: Farndon Windmill, Crees Lane
Parish: Newark
Overall Condition: Poor
Risk Category: 3
Details: Windows missing. Door rotting and boarded over. Walls have very deeply recessed mortar and have areas of severe spalling next to first and second floor windows with some repointing below. Odd bricks missing. Windows all unglazed, metal frames survive, vegetation growing on window sills. Key stone reading JD 183? (3or8)
Survey Date: 28.07.2017
8, 8a, 8b, Lombard Street

Site Name: 8, 8a, 8b, Lombard Street
Parish: Newark
Overall Condition: Poor
Risk Category: 3
Details: Gable end bowed and chimney stack leaning. One boarded up window to the right of the main entrance and one large pain of glass on the frontage cracked.
Survey Date: 18.05.2017
Boundary Wall and Gate piers to the Friary

Site Name: Boundary Wall and Gate piers to the Friary, Appleton Gate
Parish: Newark
Overall Condition: Poor
Risk Category: 3A
Details: Wall is heavily worn at various sections along its length. Extensive repairs are evident though still large proportions of heavily worn stone can be seen. Gate and gate piers are in good condition and appear to have been renovated.
Survey Date: 13.09.017
25 and 27, Balderton Gate

Site Name: 25 and 27, Balderton Gate
Parish: Newark
Overall Condition: Poor
Risk Category: 3
Details: Two shops. 25 is vacant and for sale. Windows in poor condition at No. 25.
Survey Date: 25.07.2017
Railing and Gate to Left of 26 and 28, Millgate

Site Name: Railing and Gate to Left of 26 and 28, Millgate
Parish: Newark
Overall Condition: Poor
Risk Category: 3A
Details: Some railings and 6 finials missing. Largely covered by vegetation at the SW end. Needs painting.
Survey Date: 15.09.2017
Beaumond Cross

Site Name: Beaumond Cross, London Road
Parish: Newark
Overall Condition: Poor
Risk Category: 3A
Details: Figure and surrounding enclave severely eroded. Brass plaques not present.
Survey Date: 28.07.2017
Remains of Newark Castle

Site Name: Remains of Newark Castle, Castlegate
Parish: Newark
Overall Condition: Poor
Risk Category: 3A
Details: Ivy and other vegetation growing from the river side wall. Central buttress showing signs of erosion and blackening, severe erosion in places. NE end buttress on river side has algae and moss growth. There is considerable amounts of vegetation growing from the wall inside the tower. There is graffiti on the window jambs and in the arches on the river side wall.
Survey Date: 25.07.2017
North Road House

Site Name: North Road House, Waltons Lane
Parish: North Muskham
Overall Condition: Poor
Risk Category: 3
Details: Ivy growing up walls. Surrounded by dense vegetation.
Survey Date: 29.06.2017
Outbuilding at North Road House
Site Name: Outbuilding at North Road House, Waltons Lane
Parish: North Muskham
Overall Condition: Poor
Risk Category: 3
Details: 2013 assessment: Roof sagging and tiles displaced , rear wall shows major signs of leaning and damage, area to the back is massively overgrown and shows major signs of neglect.
2017 Survey: Property now too overgrown to survey.
Survey Date: 29.06.2017
Railings and Gate at North Road House
Site Name: Railings and Gate at North Road House, Waltons Lane
Parish: North Muskham
Overall Condition: Poor
Risk Category: 3A
Details: Railings almost completely concealed behind dense evergreen vegetation. Where they are visible by the gate they are rusty with peeling paint. Wooden gate intact. Gate piers in dense vegetation.
Survey Date: 29.06.2017
Ollerton Hall

Site Name: Ollerton Hall, Main Street
Parish: Ollerton and Boughton
Overall Condition: Poor
Risk Category: 3
Details: Most windows boarded up the few that haven’t been like the roof dormers and Velux have been smashed.
Survey Date: 21.07.2017
Tomb Chest of Robert Sherbrooke

Site Name: Tomb Chest of Robert Sherbrooke adjacent the East Side of Workshops in Former Wood Yard of Oxton Hall, Blind Lane
Parish: Oxton
Overall Condition: Poor
Risk Category: 3A
Details: Iron railing corroded. At one corner the plinth is broken and the corner rail with urn top is lying beside the tomb. Missing 4 railings, one has been placed against the tomb. Tree is lifting the edge and is likely to cause more damage. Plinth stone broken and corner missing. Inscription faded.
Survey Date: 01.06.2017
Terrace Walls and Gazebos at Thoresby Hall

Site Name: Terrace Walls and Gazebos at Thoresby Hall
Parish: Perlethorpe cum Budby
Overall Condition: Poor
Risk Category: 3A
Details: Large amount of movement in areas of wall.
Survey Date: 18.11.2013
Barn and Stables to North of Ceres Lodge Farmhouse
Site Name: Barn and Stables to North of Ceres Lodge Farmhouse
Parish: Perlethorpe cum Budby
Overall Condition: Poor
Risk Category: 3
Details: Roof slipped Westmorland slates, rainwater goods hanging off. Glazing in windows smashed.
Survey Date: 18.11.2013
North Lamp at West Gate at Church of St John

Site Name: North Lamp at West Gate at Church of St John, Church Lane
Parish: Perlethorpe cum Budby
Overall Condition: Poor
Risk Category: 3A
Details: Stone base and upright covered in algae. Ivy to lower part of posts. Glass removed from lantern. The design between the post and the lantern is very fine and bending causing the metal lamp frame to lean.
Survey Date: 24.11.2017
Monument to Nelsons Navy
Site Name: Monument to Nelsons Navy
Parish: Perlethorpe cum Budby
Overall Condition: Poor
Risk Category: 3A
Details: Stone in fair order but inscription becoming illegible. Overgrown with overhanging rhododendron bushes.
Survey Date: 24.11.2017
Mill at Mill Farm
Site Name: Mill at Mill Farm, Mill Farm Lane
Parish: Rolleston
Overall Condition: Poor
Risk Category: 3
Details: Front and rear gutters completely full of mature vegetation. Granary buildings is no longer water tight and roof and top courses of wall are coming away from the mill building. Windows unglazed or with rotten frames. Pigeons present in both buildings and floors covered in guano.
Survey Date: 16.06.2017
Sunnyside, Staythorpe Road

Site Name: Sunnyside, Staythorpe Road
Parish: Rolleston
Overall Condition: Poor
Risk Category: 3
Details: Roof ridge is slanted. Vegetation growing in rainwater goods. Vegetation and cracking on walls. Rot and mould on windows. Door in poor condition. Bricks missing on gable end. Rotten windows, ivy growing inside window. Boundary wall damaged and in other areas is badly eroded and parts have been rebuilt, capping coping bricks missing in places.
Survey Date: 16.06.2017
Sundial in Churchyard 11 metres South of the Porch of Church of Holy Trinity
Site Name: Sundial in Churchyard 11 metres South of the Porch of Church of Holy Trinity, Station Road
Parish: Rolleston
Overall Condition: Poor
Risk Category: 3A
Details: Inscription illegible. Plinth has cracks in stone and is leaning. Sundial lead is missing. Spores/fungi/vegetation growing.
Survey Date: 16.06.2017
Boundary Wall at Church of St Wilfrid

Site Name: Boundary Wall at Church of St Wilfrid, Church Lane
Parish: South Muskham
Overall Condition: Poor
Risk Category: 3A
Details: Mature ivy growing within the walls lifting off the coping stones in places. Severe stone erosion north of the gate. Inscription on gate becoming hard to read. Some poor pointing to coping stones. Inside gravestones and vegetation are in close proximity to walls. South gate piers covered in ivy.
Survey Date: 29.06.2017
Park View House, 28, Westgate

Site Name: Park View House, 28, Westgate
Parish: Southwell
Overall Condition: Poor
Risk Category: 3A
Details: Recessed mortar to stone wall. Lots of vegetation growing out of the front of the wall. Both gate piers are cracked.
Survey Date: 26.05.2017
Garden Temple
Site Name: Garden Temple Approximately 450 metres South West of Norwood Park
Parish: Southwell
Overall Condition: Poor
Risk Category: 3A
Details: Plastic gutters – full of leaves. Pediment looks renewed/not original. Plywood repairs to bases of both pilasters and around the capital on RHS are rotting. Extensive ivy growth – walls need patch pointing. Large Sycamore growing to RHS is too close. Interior: some signs of re-plastering which needs lime washing. Broken flagstones.
Survey Date: 08.07.2017
Ha-ha Approximately 75 metres South and East of Norwood Park
Site Name: Ha-ha Approximately 75 metres South and East of Norwood Park
Parish: Southwell
Overall Condition: Poor
Risk Category: 3A
Details: Middle section very overgrown. Northern gates and railings heavily corroded at fixings into stone. Needs repointing, some brick replacement, removal of vegetation and capping re-setting.
Survey Date: 26.05.2017
Boundary Wall and Gate piers at Honing House

Site Name: Boundary Wall and Gate piers at Honing House, Westgate
Parish: Southwell
Overall Condition: Poor
Risk Category: 3A
Details: Heavy amount of spalling to large sections of brickwork. Mortar completely eroded in certain places, some movement. Wrought iron gates in fair condition.
Survey Date: 26.05.2017
Boundary Wall and Gate piers at Sacrista Prebend

Site Name: Boundary Wall and Gate piers at Sacrista Prebend, Westgate
Parish: Southwell
Overall Condition: Poor
Risk Category: 3A
Details: Very heavy spalling of brickwork and deeply recessed pointing (some cement repointing). Large crack running through the walls and one coping stone that appears to have been caused by tree behind wall pushing wall outwards as it has grown. Wall appears to have been pinned. Some water damage below gate pier capstones and both gate piers worn at the bases. Quite a severe bow to the wall is present, quite possibly caused by adjacent tree.
Survey Date: 26.05.2017
Barns 50 metres North East of Bath Cottage

Site Name: Barns 50 metres North East of Bath Cottage, Bath Lane
Parish: Southwell
Overall Condition: Poor
Risk Category: 3
Details: Barn appears to be in a semi ruinous state though still in some form of use as an outbuilding. Windows are currently removed there is extensive damage to brickwork and the roof has various holes.
Survey Date: 26.05.2017
Boundary Walls and Gate piers at 28 and 32, Westgate

Site Name: Boundary Walls and Gate piers at 28 and 32, Westgate
Parish: Southwell
Overall Condition: Poor
Risk Category: 3A
Details: Wall – extensive wear of both mortar and blockwork. Gate piers – In 2013 “Right hand ball finial is cracked and in a very poor condition.” Now one pier removed completely probably to widen access to building site behind, other pier capstone and finial also removed.
Survey Date: 26.05.2017
Stable Range and attached Boundary Wall
Site Name: Stable Range and attached Boundary Wall 20 metres South East of Normanton Hall, Normanton Road
Parish: Southwell
Overall Condition: Poor
Risk Category: 3
Details: End gables on the road are covered with dry green algae. Northernmost gate pier: bricks shattered and loose at top of pier. Some patches of cement mortar badly effecting bricks.
Survey Date: 26.05.2017
Ice House
Site Name: Ice House Approximately 630 metres East of Norwood Park
Parish: Southwell
Overall Condition: Poor
Risk Category: 3A
Details: Barrel arch of entrance chamber has moved and the bricks are falling from the roof. Large crack in RHS wall of entrance chamber.
Survey Date: 23.04.2014
Stable and Potting Sheds
Site Name: Stable and Potting Sheds 5 metres North of Easthorpe Lodge, Easthorpe
Parish: Southwell
Overall Condition: Poor
Risk Category: 3
Details: Front Elevation: Window frames rotten and no glazing, guttering full of vegetation.
Survey Date: 26.05.2017
Cart shed 25 metres South West of Manor Farmhouse

Site Name: Cart shed 25 metres South West of Manor Farmhouse, Corkhill Lane
Parish: Southwell
Overall Condition: Poor
Risk Category: 3
Details: Open fronted 4 bay cart shed. Bay 1(left hand bay) closed off to rest of bays. Large Buddleia growing in opening. Back wall very damp, algae growing. Bays 2 and 3 algae and ferns growing out of inside of back wall – efflorescence. Large weeds growing in these bays. Bay 4 Large crack in back wall. Pillars of archways that divide the bays – brickwork eroding. No gutter present, only gutter support remain – but no signs that this is causing problems on the front elevation.
Survey Date: 26.05.2017
Boundary Wall and Gate piers at Rampton Prebend

Site Name: Boundary Wall and Gate piers at Rampton Prebend, Westgate
Parish: Southwell
Overall Condition: Poor
Risk Category: 3A
Details: Heavy spalling of brickwork and deeply recessed mortar, some concrete repointing. Weathering of gate piers and signs of water damage at mortar joint between pier and cap stone. Central pedestrian access the gate pier to the left of gate is concrete, to the right stone, both weathered (Lichen). Gate piers to the vehicular access SW gate pier replaced (like for like) in new ashlar stone NE pier some erosion at the base but in good order.
Survey Date: 26.05.2017
Boundary Wall and Gate piers at Dunham House
Site Name: Boundary Wall and Gate piers at Dunham House, Westgate
Parish: Southwell
Overall Condition: Poor
Risk Category: 3A
Details: Some corrosion of iron gate. Right-hand cap stone to gate pier completely missing. Heavy build-up of detritus with weathering of mortar and spalling of brickwork.
Survey Date: 26.05.2017
Gateway and Railings at Brackenhurst Hall

Site Name: Gateway and Railings at Brackenhurst Hall, Nottingham Road
Parish: Southwell
Overall Condition: Poor
Risk Category: 3A
Details: Lower walls overgrown with vegetation. Coping on dwarf wall to left of gate has been smashed. Gate and railings beginning to show signs of corrosion and neglect.
Survey Date: 26.05.2017
Sundial 12 metres South of Church of All Saints
Site Name: Sundial 12 metres South of Church of All Saints, Church Street
Parish: Sutton on Trent
Overall Condition: Poor
Risk Category: 3A
Details: North Face: Flaking and eroded with lichen. Inscription illegible. East Face: Flaking and erosion with lichen and repaired corner at top with visible inscription reading “B??LL”. South Face: Erosion and lichen. Inscription reading “George”. West Face: Lichen, severe flaking and erosion, repair to top corner. Inscription illegible. Capstone of different stone with algae and replacement dial.
Survey Date: 15.06.2017
Group of Five Headstones Five metres South of Church of St Peter

Site Name: Group of Five Headstones Five metres South of Church of St Peter, Church Lane
Parish: Upton
Overall Condition: Poor
Risk Category: 3A
Details: Inscriptions well preserved as stones are leaning with their faces down and protected. Substantial moss growth on the rear of the 3rd and 5th headstones from the church end of the row. All have lichen.
Survey Date: 09.06.2017
Town Farmhouse and adjoining Cottages and Water Pump

Site Name: Town Farmhouse and adjoining Cottages and Water Pump, Main Road
Parish: Upton
Overall Condition: Poor
Risk Category: 3
Details: Showing major signs of neglect. Pump not accessible due to security fencing. Ivy and climbing plants growing up both elevations, starting to cover windows and grow into gutters. Ivy also growing inside.
Survey Date: 06.09.2017
Tomb Slab at East end of Church of St Swithin

Site Name: Tomb Slab at East end of Church of St Swithin, Potter Lane
Parish: Wellow
Overall Condition: Poor
Risk Category: 3A
Details: Moved from next to the wall to 3m east of chancel. Stone badly eroded on the west face and flaking on the east face. Its original position next to the wall is identifiable, where stone is cleaner in this position.
Survey Date: 18.07.2017
Ice House in Winkburn Park
Site Name: Ice House in Winkburn Park, Winkburn Lane
Parish: Winkburn
Overall Condition: Poor
Risk Category: 3A
Details: Brickwork opening in poor state, most of pointing missing to exposed areas of brickwork. No door or grill covering to ice house. Photos taken from cemetery and field up to ice house.
Survey Date: 08.03.2014
Thompson Tomb in Church of All Saints
Site Name: Thompson Tomb in Church of All Saints, Church Yard, 15 Feet South of Baptistery, Gainsborough Road
Parish: Winthorpe
Overall Condition: Poor
Risk Category: 3A
Details: Inscription is illegible on north and south sides. Stem to urn is cracked – showing rusty iron cramp. South eastern fluted shaft broken at the base. Two capping stones capping the capitals are chipped. Ball feet 1 intact, 1 in half, 2 missing and metal rod exposed and rusting.
Survey Date: 23.06.2017
District: Rushcliffe
Overall Condition: Very bad
Yew Tree Farmhouse and adjoining Garden Wall
Site Name: Yew Tree Farmhouse and adjoining Garden Wall, Main Street (NCC REF 8.22.1)
Parish: Hawsworth
Overall Condition: Very Bad
Risk Category: 1A (Garden Wall)
Details: Overall Condition and Risk Category due to condition of mud wall section of garden wall- assessed in 2017.
Survey Date: 2017
Old Lock River Soar

Site Name: Old Lock River Soar (NCC REF 8.26.17)
Parish: Kingston on Soar
Overall Condition: Very Bad
Risk Category: 1A
Details: Lock chamber filled in and grassed over. Old lock gates decaying and rotten. Evidence of lock walls on both sides but overgrown. Steps visible and mooring posts.
Survey Date: 17.10.2018
Pillboxes at Tollerton Airport

Site Name: Pillboxes at Tollerton Airport (NCC REF 8.52.10)
Parish: Tollerton
Overall Condition: Very Bad
Risk Category: 1
Details: Substantial vertical crack through the middle of the south wall and through the roof slab. Large Poplar trees planted at the corners.
Survey Date: 19.09.2018
Church Site Farmhouse
Site Name: Church Site Farmhouse, Wymeswold Road (NCC REF 8.48.2)
Parish: Thorpe in the Glebe
Overall Condition: Very Bad
Risk Category: 1
Details: SW gable is coming away from the front elevation. Quoins are also coming away. Windows have worn paint and frames are rotting. Some glazing bars missing from Yorkshire sash to the rear elevation. Glazing missing some – boarded from the inside. Evidence of brick and cement gap filling.
Survey Date: 06.09.2018
Overall Condition: Poor
Boundary Walls and Water Pump

Site Name: Number 7 with adjoining Outbuilding, Boundary Walls and Water Pump, Church Street (NCC REF 8.3.1)
Parish: Bingham
Overall Condition: Poor
Risk Category: 3A (Boundary Wall)
Details: Risk Cat 3A due to poor condition of boundary walls and pump. Boundary wall to road side has extreme lean (Mud section of wall assessed in 2015 as being in need of attention having been painted and having self set vegetation to the base of the wall). Water pump has no timber casing to 2 sides, metal pump rusting. House in fair condition. Large unfinished hole in gable end above side door for waste pipe
Survey Date: 01.08.2018
The Manor House

Site Name: The Manor House, 22, Market Place (NCC REF 8.3.18)
Parish: Bingham
Overall Condition: Poor
Risk Category: 3
Details: Upper left hand window is missing the cill. Right-hand side boarding to window trapping water behind. Vegetation to south gable end. Air-brick blocked. Attached building to north also vacant and boarded.
Survey Date: 03.07.2018
Cottage 12 metres South of the Radcliffe Arms

Site Name: Cottage 12 metres South of the Radcliffe Arms, Loughborough Road
(NCC REF 8.5.14)
Parish: Bunny
Overall Condition: Poor
Risk Category: 3
Details: Guttering broken, leading damp causing vegetation growth at bottom of the wall. Some broken bricks. Chimney full of vegetation. Salts to north elevation.
Survey Date: 05.07.2018
Group of Headstones Approx. 12m S of S Transept of Old Church of St Mary

Site Name: Group of Headstones Approx. 12m S of S Transept of Old Church of St Mary, New Road
(NCC REF 8.8.12)
Parish: Colston Bassett
Overall Condition: Poor
Risk Category: 3A
Details: Headstone 6 is in poor condition with the stone splitting along top edge and down front face with an area of discolouration. The other headstones are in fair condition but have incised marks from strimming.
Survey Date: 18.07.2018
Chest Tomb in Churchyard of Church of All Saints

Site Name: Chest Tomb in Churchyard of Church of All Saints, 1.5m N of N Chapel, Church Lane
(NCC REF 8.10.5)
Parish: Cotgrave
Overall Condition: Poor
Risk Category: 3A
Details: Cap stone dislodged. Panels to the long side have no plaques or legible inscriptions. Plaques to the short ends are in fair condition.
Survey Date: 09.07.2018
Headstones in Churchyard of Church of St Giles

Site Name: Headstones in Churchyard of Church of St Giles, North of Chancel, Fern Road
(NCC REF 8.11.6)
Parish: Cropwell Bishop
Overall Condition: Poor
Risk Category: 3A
Details: Middle headstone of the three is cracked with a large piece missing.
Survey Date: 11.07.2018
Garden House, Stable and Garden Wall
Site Name: Garden House, Stable and Garden Wall at the Hill, Kirk Hill
(NCC REF 8.13.7)
Parish: East Bridgford
Overall Condition: Poor
Risk Category: 3
Details: Extensive unmanaged climbing vegetation to stepped gable end. Large vertical stepped crack next to doorway. Numerous tiles missing. Rainwater goods missing or hanging off. Brickwork unsound especially to north gable of stable. Loose, missing eroded and spalled bricks. Wall to the west of the stable has been rebuilt.
Survey Date: 14.11.2018
The Hill, Kirk Hill
Site Name: The Hill, Kirk Hill (NCC REF 8.13.8)
Parish: East Bridgford
Overall Condition: Poor
Risk Category: 3
Details: Failing valley gutters to the roof. Extensive cracking of render to the south elevation.
Based on survey report by Staniforth Architects: Feb 2020.
Gateway to Former Elton Manor

Site Name: Gateway to Former Elton Manor, Sutton Lane
(NCC REF 8.16.6)
Parish: Elton-on-the-Hill
Overall Condition: Poor
Risk Category: 3A
Details: Wall has many large cracks and is leaning. Base of brick pier is cracked through. Top of pillar on gate was broken in 2 but was repaired in Oct 2018
Survey Date: 10.10.2018
The Aviaries & adjoining Garden Walls
Site Name: The Aviaries & adjoining Garden Walls, Flintham Hall
(NCC REF 8.18.14)
Parish: Flintham
Overall Condition: Poor
Risk Category: 3
Details: Stepped crack running through 18 courses of bricks to the interior of the west wall. Ground level to the rear is covering the lower 6 courses of brick at the east end. Damp behind downpipe, algae to rear wall. Roof has extensive moss. The doors to the individual aviaries are rusted and in very bad condition with mostly broken mesh. Garden wall has gaps between the capping stones which is causing mortar to fail in the upper courses.
Survey Date: 21.12.2018
Garden House with adjoining Walls and Potting Sheds
Site Name: Garden House with adjoining Walls and Potting Sheds at Flintham Hall
(NCC REF 8.18.13)
Parish: Flintham
Overall Condition: Poor
Risk Category: 3
Details: Potting sheds – Gutters hanging off, causing severe damage to brickwork in these areas of the north wall. Bricks missing and spalling. Mature vegetation in the areas where the gutters and downpipes are failing. Large plastic vent to one window of the north wall. Some brickwork below easternmost window missing. Large roof lights. Erosion of some bricks and deeply recessed mortar to lower courses. Garden House – Some minor brick spalling and evidence of repointing. Front elevation inspected.
Survey Date: 21.12.2018
Store at South Notts Bus Depot
Site Name: Store at South Notts Bus Depot, Leake Rd
(NCC REF 8.20.4)
Parish: Gotham
Overall Condition: Poor
Risk Category: 3
Details: Exterior deteriorating as follows. Large areas of render failing and exposed brick eroding and spalling. Roof bowing. Vegetation growing around base of wall. Windows rusting.
Survey Date: 30.08.2018
Tapering Grave Slab in Churchyard of Church of All Saints

Site Name: Tapering Grave Slab in Churchyard of Church of All Saints South of Nave, Sutton Lane
(NCC REF 8.21.7)
Parish: Granby
Overall Condition: Poor
Risk Category: 3A
Details: Almost completely covered in ivy. Small section at E end visible and shows that the stone is eroding.
Survey Date: 16.08.2018
Headstones in Churchyard of Church of St Luke

Site Name: Headstones in Churchyard of Church of St Luke, S of S Aisle East of Porch, Main Street
(NCC REF 8.23.20)
Parish: Hickling
Overall Condition: Poor
Risk Category: 3
Details: No. 9 has a small section missing at the top. 10-16 third from right has fallen down, one next to this has part missing from bottom corner.
Survey Date: 11.07.2018
Grantham Canal
Site Name: Grantham Canal, 13 Miles Post Approximately 300 metres West of Main Street
(NCC REF 8.23.18)
Parish: Hickling
Overall Condition: Poor
Risk Category: 3A
Details: Horizontal crack running under the numbers. Paint slip and open and metal rusting and flaking beneath the paint. Sturdy in the ground. Legible. Paint peeling at the base to reveal blue undercoat.
Survey Date: 26.09.2018
Mann Tomb Chest

Site Name: Mann Tomb Chest Immediately South West of Tower of Church of St Luke, Main Street
(NCC REF 8.23.12)
Parish: Hickling
Overall Condition: Poor
Risk Category: 3A
Details: Extensive unmanaged vegetation growth covering the top half of the tomb. Ivy growing up from the base and algae growth.
Survey Date: 11.07.2018
Frameknitter’s Workshop and Privies
Site Name: Frameknitter’s Workshop and Privies to Rear of Nos. 69-73, Nottingham Road
(NCC REF 8.25.71)
Parish: Keyworth
Overall Condition: Poor
Risk Category: 3
Details: Risk Cat related to the windows of the N elevation as a feature that is integral to the significance of this building. The window frames to this elevation are almost entirely unglazed. Some glazing bars are missing. Corrugated metal sheeting boards the windows from the inside. Paint has worn away revealing the timber which appears to be in repairable condition. The doors to the ground floor do not have lintels and there is evidence of crude cement repointing over the doors and a stepped crack up to the windows.
Survey Date: 30.08.2018
Pavilion in the Garden of Kingston Hall

Site Name: Pavilion in the Garden of Kingston Hall, Gotham Road
(NCC REF 8.26.5)
Parish: KIngston on Soar
Overall Condition: Poor
Risk Category: 3A
Details: Covered in climbing plant. Only the NE and SE elevations visible and none of the roof due to the vegetation which is completely unmanaged. Being used for storage.
Survey Date: 10.10.2018
Headstones in the Graveyard of the Former Church of St Wilfred
Site Name: Headstones in the Graveyard of the Former Church of St Wilfred Approximately 200 metres North of ‘Kinross’, Kinoulton Lane (NCC REF 8.27.8)
Parish: Kinoulton
Overall Condition: Poor
Risk Category: 3A
Details: Assessed in terms of the poorest condition stones. Unkempt graveyard, animals must be grazing this area. Some stones damaged and other severely leaning.
Survey Date: 08.08.2018
Grantham Canal

Site Name: Grantham Canal, Clarks Bridge (NCC REF 8.27.5)
Parish: Kinoulton
Overall Condition: Poor
Risk Category: 3A
Details: Four large cracks visible from beneath and above the parapet, from the coping stones of the parapet to half way down the arch.
Survey Date: 17.10.2018
Gateway and Walls to enclosure S of Langar Hall
Site Name: Gateway and Walls to enclosure S of Langar Hall btwn Churchyard and Cropwell Bishop Road (NCC REF 8.29.13)
Parish: Langar cum Barnstone
Overall Condition: Poor
Risk Category: 3A
Details: Top half of the ashlar gate piers are completely engulfed in tree and foliage. Finials and moulded cornices are not visible. Wall in fair condition but gate piers poor. Section of wall behind tree in section containing the gate is severely eroded.
Survey Date: 16.08.2018
Crosland Chest Tomb

Site Name: Crosland Chest Tomb in Churchyard of Church of St Andrew Approximately 5 metres South of the West end of the Nave, Church Lane (NCC REF 8.29.10)
Parish: Langar cum Barnstone
Overall Condition: Poor
Risk Category: 3A
Details: Ivy covering tomb.
Survey Date: 12.07.2018
The Unicorns Head Public House

Site Name: The Unicorns Head Public House, Main Street
(NCC REF 8.29.22)
Parish: Langar cum Barnstone
Overall Condition: Poor
Risk Category: 3
Details: Overall condition and Risk Category relate outbuilding that has no roof.
Survey Date: 12.07.2018
Church of St Mary

Site Name: Church of St Mary, Church Street (NCC REF 8.32.1)
Parish: Orston
Overall Condition: Poor
Risk Category: 3
Details: Tower movement being monitored.
Survey Date: 05.07.018
Headstones in Churchyard of Church of St Margaret

Site Name: Headstones in Churchyard of Church of St Margaret, West of Tower, South Side, Church Lane (NCC REF 8.33.3)
Parish: Owthorpe
Overall Condition: Poor
Risk Category: 3A
Details: Headstones 13-16: Tree and ivy has overgrown the smaller headstone.
Survey Date: 09.07.2018
Wall, Railings and Gateways to Ruddington Free School

Site Name: Wall, Railings and Gateways to Ruddington Free School, The Green and Wall, Railings and Gateways to Ruddington Free School, Asher Lane (NCC REF 8.38.10)
Parish: Ruddington
Overall Condition: Poor
Risk Category: 3A
Details: Paint peeling off the gate & railings. Bricks missing, spalling & deep mortar erosion to pier bases. Coping stones eroded, with some railings exposed and extensive moss building up.
Survey Date: 04.07.2018
Ice House at Copper Top
Site Name: Ice House at Copper Top, Manor Park (NCC REF 8.38.18)
Parish: Ruddington
Overall Condition: Poor
Risk Category: 3A
Details: Inside walls are very damp and have algae and extensive efflorescence. Top surface is covered with weed suppressant membrane. Below ground cavity is infilled and capped with cement or possibly gypsum. Well preserved superstructure and entrance. Risk Cat due to condition of brick to the interior of passageway.
Survey Date: 06.09.2018
Greenhouse at Ruddington Golf Club
Site Name: Greenhouse at Ruddington Golf Club, Wilford Road (NCC REF 8.38.24)
Parish: Ruddington
Overall Condition: Poor
Risk Category: 3
Details: Many of the roof pains are broken. Vegetation growing all round the building.
Survey Date: 04.07.2018
Boundary Wall and adjoining Stable at Church of St Wilfrid

Site Name: Boundary Wall and adjoining Stable at Church of St Wilfrid, Car Colston Road
(NCC REF 8.41.2)
Parish: Screveton
Overall Condition: Poor
Risk Category: 3A
Details: 3A due to poor condition of boundary wall. Stable is maintained from the Rectory side but not being maintained from the churchyard side. Boundary wall in poor condition and in is leaning in places.
Survey Date: 25.07.2018
The Windmill, Shelford Road

Site Name: The Windmill, Shelford Road (NCC REF 8.42.10)
Parish: Shelford and Newton
Overall Condition: Poor
Risk Category: 3
Details: No roof or windows frames or glazing. Vegetation growing out of middle of structure.
Survey Date: 06.07.2018
Gateway and Walls about 20m N of Shelford Manor House
Site Name: Gateway and Walls about 20m N of Shelford Manor House, Manor Lane
(NCC REF 8.42.6)
Parish: Shelford and Newton
Overall Condition: Poor
Risk Category: 3A
Details:
Survey Date:
Ice House at Manor Farmhouse
Site Name: Ice House at Manor Farmhouse, Main Street
(NCC REF 8.43.8)
Parish: Shelton
Overall Condition: Poor
Risk Category: 3A
Details: NE entrance wall has significant horizontal leading to a stepped crack and upper part of wall above this is leaning in. SW entrance wall is missing bricks at either end. Deteriorating.
Survey Date: 16.08.2018
Water Pump 12 metres West of Manor Farmhouse
Site Name: Water Pump 12 metres West of Manor Farmhouse, Main Street (NCC REF 8.43.7)
Parish: Shelton
Overall Condition: Poor
Risk Category: 3A
Details: Pump in similar condition to condition at listing but now missing the top flap.
Survey Date: 16.08.2018
Old Walling and Doorway in Garden of Number 6

Site Name: Old Walling and Doorway in Garden of Number 6, Approximately 7 metres North East of the House, Park Lane
(NCC REF 8.47.23)
Parish: Sutton Bonnington
Overall Condition: Poor
Risk Category: 3A
Details: Completely covered in vegetation as in the listing photograph. Not possible to assess the condition of the wall although clearly still standing.
Survey Date: 28.06.2018
Church of St Helena

Site Name: Church of St Helena, Church Lane (NCC REF 8.49.1)
Parish: Thoroton
Overall Condition: Very Bad
Risk Category: 3
Details: Very Bad in line with Historic England’s assessment of the risk of further rapid deterioration or loss of fabric with no solution.
Survey Date: 03.07.2018
Pillbox at Tollerton Airport (1)

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.6)
Parish: Tollerton
Overall Condition: Poor
Risk Category: 3
Details: Brick erosion and spalling with efflorescence through mortar. Interior full of stagnant water with algae on the surface. Rusted gate. Possible public safety issue with open steps and standing water in the base.
Survey Date: 09.09.2018
Pillbox at Tollerton Airport (2)

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.8)
Parish: Tollerton
Overall Condition: Poor
Risk Category: 3
Details: Partial survey of east elevation and roof. Surrounded by mature vegetation.
Survey Date: 19.09.2018
Pillbox at Tollerton Airport (3)

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.12)
Parish: Tollerton
Overall Condition: Poor
Risk Category: 3
Details: South and west elevations surveyed. Substantial vertical crack through wall and roof slab and window. Large Poplar trees planted at the corners, probably the cause of the structural problems.
Survey Date: 19.09.2018
Pillbox at Tollerton Airport (4)
Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.16)
Parish: Tollerton
Overall Condition: Poor
Risk Category: 3
Details: Not Located, possibly covered in vegetation. Not clearly visible from the airport side.
Survey Date: 19.09.2018
Pillbox at Tollerton Airport (5)

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.18)
Parish: Tollerton
Overall Condition: Poor
Risk Category: 3
Details: Lack of management of vegetation. Upper courses of bricks missing and loose bricks present around window lintels. Extensive vegetation to roof.
Survey Date: 19.09.2018
Pillbox at Tollerton Airport (6)
Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.19)
Parish: Tollerton
Overall Condition: Poor
Risk Category: 3
Details: Substantial vertical crack to the NW corner which continues through roof slab. Extensive severe brick erosion and spalling. Mature vegetation to entrances.
Survey Date: 19.09.2018
Pillbox at Tollerton Airport (7)

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.21)
Parish: Tollerton
Overall Condition: Poor
Risk Category: 3
Details: Lack of management of vegetation. Not accessible, not visible as in centre of mature vegetation.
Survey Date: 19.09.2018
Pillbox at Tollerton Airport (8)

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.22)
Parish: Tollerton
Overall Condition: Poor
Risk Category: 3
Details: Missing upper courses of brick cladding, with grasses growing from walls. Loose bricks to the top of remaining courses. Brick skin to the entrance peeling away.
Survey Date: 19.09.2018
Pillbox at Tollerton Airport (9)

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.23)
Parish: Tollerton
Overall Condition: Poor
Risk Category: 3
Details: Brick skin coming away. Top courses of bricks missing and loose bricks to the top of the remaining courses. Extensive soil and grass to the roof. North elevation surveyed.
Survey Date: 19.09.2019
Old Trent Bridge Flood Arches

Site Name: Old Trent Bridge Flood Arches, London Road
(NCC REF 8.54.5)
Parish: West Bridgford
Overall Condition: Poor
Risk Category: 3A
Details: Missing dressed stones to the south arch of the west face and the cutwater. Some vegetation to east face and walkway arches. Extensive vegetation to west face.
Survey Date: 07.12.2018
Headstone at Church of the Holy Rood

Site Name: Headstone 16 metres South of South Aisle at Church of the Holy Rood, Village St
(NCC REF 8.54.16)
Parish: West Bridgford
Overall Condition: Poor
Risk Category: 3A
Details: Headstone has been removed from the ground and is leaning against the church wall.
Survey Date: 24.07.2018
Pair of Headstones at Church of the Holy Rood

Site Name: Pair of Headstones 10m & 12m S of S Aisle at Church of the Holy Rood, Village St
(NCC REF 8.54.17)
Parish: West Bridgford
Overall Condition: Poor
Risk Category: 3A
Details: Both headstones have been removed from the ground and are leaning against the church wall.
Survey Date: 26.07.2018
Sundial in Churchyard of Church of St Helen
Site Name: Sundial in Churchyard of Church of St Helen, Single metre South of the Chancel, Main Street
(NCC REF 8.55.4)
Parish: West Leake
Overall Condition: Poor
Risk Category: 3A
Details: Missing
Survey Date: 16.07.2018
Boundary Wall at Church of St John of Beverley

Site Name: Boundary Wall at Church of St John of Beverley, to Church Street and Church Walk
(NCC REF 8.56.2)
Parish: Whatton in the Vale
Overall Condition: Poor
Risk Category: 3A
Details: Large crack and bulge to wall with some fallen stone work to the ground below. Corner stone pier (left hand side end of wall) signs of damage. Coping stones not secure to wall (in sections down Church Walk). Extensive cracking alongside wall (Church Walk) possibly caused by tree roots. Ivy growing through crack and wall bulging.
Survey Date: 06.07.2018
District: Gedling
Overall Condition: Poor
Boundary Wall, Piers and Gate at Bestwood Pumping Station

Site Name: Boundary Wall, Piers and Gate at Bestwood Pumping Station, Mansfield Road
(NCC REF 7.2.12)
Parish: Bestwood St. Albans
Overall Condition: Poor
Risk Category: 3A
Details: Lower half of wall is damp and has ferns and algae growing. Survey nail in stone. One coping stone damaged. Significant moss coverage at south end. Gate piers – section have shifted out of line and capital is misaligned. Small section of molded column decoration has been removed.
Survey Date: 18.08.2017
Spire Top

Site Name: Spire Top One and a Half metres West of South Aisle at Church of St Helen, Church Road
(NCC REF 7.3.2)
Parish: Burton Joyce
Overall Condition: Poor
Risk Category: 3A
Details: Heavily weathered, stone has been eroded considerably.
Survey Date: 27.07.2017
Minta’s Printing Works

Site Name: Minta’s Printing Works, Main Street (NCC REF 7.4.9)
Parish: Calverton
Overall Condition: Poor
Risk Category: 3
Details: Window grading given relates to first floor windows only (with the exception of one window on the ground floor east elevation) – windows are in a very poor condition with rotten casements. Heavy erosion to brickwork at street level (approx. 1m high). Large amount of ivy growing to the west elevation at first floor, into guttering and onto roof.
Survey Date: 18.07.2017
Bonington House

Site Name: Bonington House, 79, High Street (NCC REF 7.5.12)
Parish: Gedling
Overall Condition: Poor
Risk Category: 3
Details: Eaves cornice has evidence of water damage and decay to left corner and centre on east elevation. Several timber casements have rotten cills. Walls need repointing in places. Centre of roof on east elevation has water ingress down wall face causing weathering to stone lintel and cill to second floor window along with damage to eaves detail. Roof has areas of missing tiles.
Survey Date: 21.07.2017
Number 21 and adjoining Outbuilding
Site Name: Number 21 and adjoining Outbuilding, Main Street
(NCC REF 7.7.18)
Parish: Linby
Overall Condition: Poor
Risk Category: 3
Details: Patches of missing roof tiles at west elevation. Missing gutter to west elevation. Incorrect connection of gutters and downpipe at east elevation. Efflorescence at wall facing north elevation. Erosion and missing brickworks facing south elevation. Broken timber frame and glazing missing at the east elevation.
Survey Date: 07.07.2017
Barn, Stable and Cart Sheds
Site Name: Barn, Stable and Cart Sheds 100m N of Weir Mill Farmhouse, Quarry Lane
(NCC REF 7.7.26)
Parish: Linby
Overall Condition: Poor
Risk Category: 3
Details: Missing roof tiles facing west. Vegetation in gutter. Broken gutter and downpipe. Vegetation growing at the step at gable at north-west corner. Stepped crack along the mortar at gable at north-west corner. Moss growing at the top of side wall at south side. Extensive weathering found at the gable at the north and walls.
Survey Date: 10.07.2017
Bottom Cross

Site Name: Bottom Cross, Main Street (NCC REF 7.7.17)
Parish: Linby
Overall Condition: Poor
Risk Category: 3A
Details: Signs of movement, stepped cracking along mortar at south elevation, monitoring of crack and level of cross required. The base shows evidence of having sunk in the area above the culvert. A large horizontal mortar bed has opened up to the LHS of the culvert and other open joints are visible in this area and on the west elevation of the cross base. The metal band supporting the front edge of the cross base above the culvert is very corroded and there are signs (loose masonry) that the culvert side walls have eroded excessively and the culvert roof/cross plinth underside looks to have moved (evidenced by an open joint and slightly misaligned stone). Cement mortar pointing to plinth is of unknown date, cracked in places and visually inappropriate.
Survey Date: 07.07.2017
Female Satyr Statue
Site Name: Female Satyr Statue 100 metres East of Newstead Abbey
(NCC REF 7.8.15)
Parish: Newstead
Overall Condition: Poor
Risk Category: 3A
Details: Statue is missing infant. Base of statue has been replaced – was originally circular, is now square. Pedestal has areas of spalling with missing stone (west and south elevation). Lead statue has numerous articles of graffiti engraved into figure.
Survey Date: 12.07.2017
Newstead Abbey and adjoining Boundary Wall

Site Name: Newstead Abbey and adjoining Boundary Wall
(NCC REF 7.8.3)
Parish: Newstead
Overall Condition: Poor
Risk Category: 3
Details: Rainwater down pipe facing north exposed due to paint peeling off, repainting required; new lead fixings to rainwater downpipe are overlapping the original fixings to the wall. Areas of eroded stonework, particularly the arches and hood moulds. Stepped crack along mortar on the south elevation of west wing. West gable of Priory Church at the northwest corner is fenced off, and has some areas of vegetation growing facing east. Boundary wall at northwest corner – areas of erosion and vegetation growing, bottom of timber door damaged.
Survey Date: 12.07.2017
HE Update 2020: By 2018, the threat of falling stone fragments from the adjoining priory church ruin meant that this part of the site was not accessible to the public. Historic England awarded a two stage grant for project development and repair work in 2018. Repairs were due to complete in late 2019 but some work was postponed until spring 2020. Work restarted in May, following a Covid-19 delay, but should be complete in mid-2020.
Garden Walls, Seats and Tunnel

Site Name: Garden Walls, Seats and Tunnel to East of Newstead Abbey
(NCC REF 7.8.13)
Parish: Newstead
Overall Condition: Poor
Risk Category: 3A
Details: Semi-circular seat to North West is under tree canopy with steps and base of seat suffering from permanent exposure to damp. Moss covering steps and bench of seat, and lichen largely covering all vertical elevations. Start of wall at North West is missing several stones. Large vegetation/tree seedling is growing up through top of the left hand gate pier, pushing and cracking coping stones. Further along the wall areas requires repointing, particularly by seat to North East. Missing coping stones to east wall. In tunnel area of bricks, approx. 1m² suffering from penetrating damp which has significantly eroded the bricks.
Survey Date: 12.07.2017
Railway Overbridge

Site Name: Railway Overbridge, Station Avenue (NCC REF 7.8.19)
Parish: Newstead
Overall Condition: Poor
Risk Category: 3A
Details: Top of bridge is very overgrown with trees growing in close proximity to bridge and ivy covering balustrade and wall at east elevation. Cast iron arch is eroded and rusted to underside. Stone piers are to south wall of tunnel have three areas of missing stone where drainage and downpipes have been installed and later removed.
Survey Date: 13.07.2017
Fountain in Cloister Garth
Site Name: Fountain in Cloister Garth at Newstead Abbey
(NCC REF 7.8.5)
Parish: Newstead
Overall Condition: Poor
Risk Category: 3A
Details: Vertical crack to round basin at east elevation. Architectural details are heavily weathered and in places have broken off completely – e.g. animal figures to top of fountain. One figure has been replaced. Fountain is not in operation. Coping stones to edge of fountain are weathered and eroded.
Survey Date: 12.07.2017
Cascade and Pool

Site Name: Cascade and Pool 20 metres North of Garden Wall at Newstead Abbey (NCC REF 7.8.14)
Parish: Newstead
Overall Condition: Poor
Risk Category: 3A
Details: Extensive vegetation and moss covering the steps of the fountain. Ivy growing through the wall of the cascade. Signs of weathering with some holes in stonework. Currently not in operation.
Survey Date: 12.07.2017
The Cannon Fort and adjoining Dock

Site Name: The Cannon Fort and adjoining Dock (NCC REF 7.8.7)
Parish: Newstead
Overall Condition: Poor
Risk Category: 3A
Details: Also appears on HE at Risk Register. Area of missing coping stones to top of fort walls. Archway entrances to towers are damaged and weathered with missing stone. Walls have considerable amount of graffiti both engraved and sprayed. Small areas of vegetation growing to top of fort wall.
Survey Date: 12.07.2017
HE Update 2020: By 2018, though structurally sound, masonry repairs were needed and the adjacent dock area required clearing. Historic England awarded a grant for project development work in 2018 and, subsequently, funding for repairs. Masonry repairs undertaken in 2019 but some remedial work was postponed until spring 2020. Work re-started in May, after a Covid-19 delay and is due to complete by July.
Fountain
Site Name: Fountain 50 metres North East of Newstead Abbey (NCC REF 7.8.11)
Parish: Newstead
Overall Condition: Poor
Risk Category: 3A
Details: Extensive moss growth to the base and spout of fountain. Large areas of stone spalling to internal bowl. Stone figure to central spout is heavily weathered, losing details and has a broken limb. Fountain is not in use.
Survey Date: 12.07.2017
Boundary Stone to North of Papplewick Pumping Station
Site Name: Boundary Stone to North of Papplewick Pumping Station at SK 58357 52201, Longdale Lane (NCC REF 7.9.39)
Parish: Papplewick
Overall Condition: Poor
Risk Category: 3A
Details: The wall was built with a niche so that the front face of the boundary stone could still be seen through the wall, the niche is now bricked up. The front face that faces the wall is well preserved and free from moss and largely free from lichen, but the other 3 faces have mature lichen growth and are covered in mature moss growth.
Survey Date: 22.09.2017
Boundary Wall and Gates at Papplewick Pumping Station

Site Name: Boundary Wall and Gates at Papplewick Pumping Station, Longdale Lane
Parish: Papplewick
Overall Condition: Poor
Risk Category: 3A
Details: Areas of heavy weathering. Mortar missing over an inch in depth in parts. Missing and crumbling bricks. Ironmongery is in good condition and has been recently painted. Stone piers – missing one leaf to corner of right pier at west elevation.
Survey Date: 05.04.2017
Gate Piers and Boundary Wall at Church of St James

Site Name: Gate Piers and Boundary Wall at Church of St James, Church Lane
(NCC REF 7.9.8)
Parish: Papplewick
Overall Condition: Poor
Risk Category: 3A
Details: Cracks to piers with areas of crumbling stone. Adjacent trees growing in close proximity to pier – in danger of toppling over. Top of piers are very weathered and losing detail. Gate requiring cleaning to remove algae.
Survey Date: 04.07.2017
Boundary Stone at Entrance to Newstead Grange
Site Name: Boundary Stone at Entrance to Newstead Grange at SK 55276 52573, Blidworth Waye
(NCC REF 7.9.40)
Parish: Papplewick
Overall Condition: Poor
Risk Category: Severely weathered and inscription is illegible. Stone is sinking into the ground and listing to one side.
Details: Severely weathered and inscription is illegible. Stone is sinking into the ground and listing to one side.
Survey Date: 04.07.2017
East Lodge at Newstead Abbey

Site Name: East Lodge at Newstead Abbey, Mansfield Road
(NCC REF 7.8.1)
Parish: Ravenshead
Overall Condition: Poor
Risk Category: 3
Details: Valley’s and guttering blocked with growing vegetation and debris. Windows require repainting and resetting with putty in places. Stone mullions, jambs and hoods are heavily weathered in areas. Walls are showing signs of weathering and repointing is necessary in places. Stepped crack above window to gable on south elevation (approx. 1inch diameter). Architectural details such as date stones are becoming very weathered.
Survey Date: 12.07.2017
Church of the Good Shepherd

Site Name: Church of the Good Shepherd,
Thackery’s Lane
Parish: Woodthorpe
Overall Condition: Poor
Risk Category:
Details: The church is suffering severe concrete decay problems requiring urgent specialist attention to avoid loss of historic fabric. An extensive programme of grant-assisted repairs, jointly funded by Historic England and National Lottery Heritage Fund, has successfully renewed complex roofing and ensured concrete facing panels are safe and weather tight. Further extensive repairs, possibly renewal, needed to mullions and glazing. Specialist advice is required. (HE 2020)
Survey Date: HE 2020
Success Stories
Yew Tree Farmhouse


Site Name: Yew Tree Farmhouse, Main Street
Parish: Kirton
Previously –
Overall Condition: Very Bad
Risk Category: 1
Details: Holes forming in roof, wall structure has been braced. Farm buildings in equally poor condition.
Date: 21.07.2017

UPDATE:
NCC Resurvey 02.03.2021
Overall Condition: Good
Risk Cat: 5
Details: Improvements made under Planning App: 16/00407/LBC & 16/00406/FUL. Appeared to be vacant at the time of survey but now has replacement pantile roof with a row of slate at the eaves. Replacement timber door and timber casement windows. Now re-rendered.
Robin Hood Hotel



Site Name: Robin Hood Hotel
Parish: Newark
Previously
Overall Condition: Very Bad
Details: In a derelict state with mature vegetation growing out of the walls to the front and out of the eaves to the rear. Windows boarded and smashed where not fully covered. Colourwash discoloured and peeling badly. Survey Date: 25.07.2017
NCC Resurvey 02.03.2021
Overall Condition: Good
Risk Cat: 5
Vacant at time of survey. Improvements made.
Milestone to Left of Carriage Arch at Saracen’s Head Inn, Market Place


SUCCESS STORY
Replacement stone erected.
Site Name: Milestone to Left of Carriage Arch at Saracen’s Head Inn, Market Place
Parish: Southwell
Previously Survey Date: 26.05.2017
Overall Condition: Very Bad
Details: Stone is now badly eroded having disappeared completely in the bottom right hand corner with the brick wall behind now visible. It is almost illegible with only ‘LON’ legible. (2017)
Entry Amended 02/02/2021
Overall Condition: Good.
Risk Cat: 5
Details: Stone has been removed and replaced with new stone with legend to reflect the origional lettering.
The Nags Head Inn



Site Name: The Nags Head Inn, Old Great North Road
Parish: Sutton on Trent
Overall Condition: Poor
Risk Category: 3
Grade II listed Nags Head Pub in 2017
Vacant, in poor condition and ‘at risk’.
Details: Planning Permission PP-05340809 for conversion to 4 dwellings. Lead flashing in valleys damaged, gutters with mature vegetation. Chimney stack leaning. Walls with damps patches, flaking paint and brick erosion.
Survey Date: 15.06.2017
UPDATE
Resurveyed 2021. Listing removed from the At Risk Register.
