The At Risk Register

The Register

Explore buildings on the register by selecting the district below. At risks sites are listed in alphabetical order by parish. Click on each ‘at risk’ site for more information about its location and status.

PLEASE NOTE: Not all areas have been surveyed yet, so some areas will have fewer ‘at risk’ sites listed than others. These will be added as more areas are surveyed, so check back regularly for updates.

See more information about the register itself at the link below.

District: Ashfield

Annesley Hall

Site Name: Annesley Hall
Grade: II
Parish: Annesley
Overall Condition: 
NCC Risk Category: NA 
Historic England assessment: 
The Hall (Grade II) suffered a serious fire in May 2015. An options appraisal and parkland management plan have been completed to help develop a sustainable future for the site and secure its conservation. Options for implementation are being explored. Historic England has provided advice.
 (HE 2020)

NCC Survey Date: NA

District: Bassetlaw 

Church of All Saints, Beckingham

black and white photo of church with square tower

Site Name: Church of All Saints, Church Street
Parish: Beckingham
Grade: II* 
Overall Condition: Poor (HE)
NCC Risk Category: NA

Historic England assessment:
Cracking appeared in the chancel several years ago. Technical advice has been obtained and stabilisation of the fabric is needed. The below ground drainage has been investigated and a new system and soakaway has been installed. Repair works to address the instability of the fabric got underway in 2019. (HE 2020)

NCC Survey Date: NA 

Church of St Giles, Darlton

church with square tower and pyramid roof

Site Name: Church of St Giles
Parish: Darlton
Grade: II*
Overall Condition:  Very Bad (HE)
NCC Risk Category: NA

Historic England assessment:
The building has suffered from widespread structural movement with vertical cracks to several elevations. The tiled roofs have numerous defects and the junction between nave and chancel is open to the elements, allowing water to penetrate the building. Rainwater goods are defective, Self-set trees in the valley gutter between the north vestry and chancel. There are blocked hoppers elsewhere, and smashed windows.
 (HE 2020)

NCC Survey Date: NA 

Church of St Giles, Carburton

Site Name: Church of St Giles, Piper Lane
Parish: Carburton
Grade: II*
Overall Condition: Poor (HE)
NCC Risk Category: NA

Historic England assessment:
Externally the church has a cementitious render coat and there is evidence of structural movement to the east end gable. Nave roof covering appears functional. Vestry roof and rainwater goods are in need of repair. Water ingress internally has caused damage to the plasterwork and ceiling panels. The church is currently closed for worship.
 (HE 2020)

NCC Survey Date: NA 

Church of St. Oswald 

Dark photo of church

Site Name: Church of St. Oswald 
Grade: I
Parish: Dunham-on-Trent
Overall Condition: Very Bad (HE)
NCC Risk Category: NA

Historic England assessment:
There are serious concerns about the tracery work to the very large belfry openings, and the structural integrity is severely compromised in several places. There are localised stonework defects elsewhere. The slated roofs, gutters and downpipes are all in very poor condition. Water ingress is evident in numerous places. 
(HE 2020)

NCC Survey Date: NA 

Church of St Peter and St Paul

Grey square tower church

Site Name: Church of St Peter and St Paul, North Green
Grade I
Parish: East Drayton
Overall Condition: Poor (HE)
NCC Risk Category: NA

Historic England assessment:
Extensive works recently completed to nave roof and medieval timber structure under a National Lottery Heritage Fund Grant for Places of Worship grant. South aisle also repaired in 2015 with grant from the Listed Places of Worship Roof Repair Fund. Repairs still needed to the leaking north aisle.
 (HE 2020)

NCC Survey Date: NA 

Church of St John the Baptist

black and white photo of side of church with two stories and square tower on left

Site Name: Church of St John the Baptist, Church Street
Grade: I
Parish: East Markham
Overall Condition: Poor (HE)
NCC Risk Category: NA

Historic England assessment:
The church was subject to heritage crime in 2019. The parish is keen to effect repairs and have sought the advice of the diocese, the conservation officer at the local authority and Historic England. (HE 2020)

NCC Survey Date: NA 

Church of St Peter

brown stone church with crenellations

Site Name: Church of St Peter
Grade: I
Parish: Gamston
Overall Condition: Poor (HE)
NCC Risk Category: NA

Historic England assessment:
The nave roof south gutter has failed and water ingress over several years has penetrated the wall head. Internally, the south aisle and tower plaster work has been removed to facilitate drying of the fabric. There is a pervasive damp problem at low level. Some structural issues exist at the stair turret junction with the nave. The Churches Conservation Trust completed a repair project in early 2019 to address some of these issues. Further repairs are planned. (HE 2020)

NCC Survey Date: NA 

Hodstock Priory Gatehouse

red brick square gatehouse with ocatognal corner towers and plants and gravel in front

Site Name: Hodstock Priory Gatehouse
Parish: Hodstock
Grade I
Overall Condition:  Fair (HE)
NCC Risk Category: NA

Historic England assessment:
Whilst the house is occupied and used as a wedding venue, the gatehouse is unused and requires
comprehensive maintenance. Historic England has encouraged the development of options for reuse of the gatehouse combined with full repair of the structure.
Following the commissioning of a condition survey, essential repairs have now been carried out. A bid to the National Lottery Heritage Fund for an educational and restoration project has been considered. (HE 2020)

NCC Survey Date: NA 

Church of All Saints

black and white photo of church with tall pointed tower

Site Name: Church of All Saints, Church Street
Grade I
Parish:  Misterton
Overall Condition: Poor  (HE 2020)
NCC Risk Category: NA

Historic England assessment:
The north aisle has suffered from structural movement and defective ground drainage is suspected. Further investigation into the cause of the movement is needed before repairs are implemented. North aisle buttresses are unstable in places and there is a need for repointing once movement has stabilised. The tower stonework at belfry stage is open jointed and localised repair is needed. (HE 2020)

NCC Survey Date: NA 

Church of St Matthew

church with flat roofed square tower in snow

Site Name:  Church of St Matthew, Main Street
Grade II*
Parish:  Normanton on Trent
Overall Condition: Poor (HE 2020)
NCC Risk Category: 

Historic England assessment:
The church was subject to heritage crime in 2019 and the interior suffered from water ingress. The interior remains damp. The tower roof is nearing the end of its life. Some pointing and isolated masonry repairs are required. The church undertook a programme of repairs in early 2020 and are keen to undertake further repairs once funds are available. (HE 2020)

NCC Survey Date: NA 

Gateway and Walls from Manor Farm to churchyard

two tombstones in grass with ruined wall with a gateway in it behind

Site Name:  Gateway and Walls from Manor Farm to churchyard
Grade I
Parish: Rampton
Overall Condition: Poor (HE 2020)
NCC Risk Category: NA 

Historic England assessment:
Stonework on the south face is very eroded, particularly on decorative plaques and lintel above the gateway; repair is needed. The north face (including plaques) is less eroded, but repointing also needed. The mortar joints to the brick wall are now deeply recessed and in need of repointing. Ivy growth is extensive to walls in particular, and is displacing stone copings. (HE 2020)

NCC Survey Date: NA 

Methodist Church, Grove Street

Site Name: Methodist Church, Grove Street
Grade II
Parish: Retford (East Retford)
Overall Condition:  Poor (HE 2020)
NCC Risk Category: 

Historic England assessment:
Part of a plaster ceiling fell in 2014, requiring the closure of the main part of the building. Investigations early in 2015 into the ceiling structure have revealed the likely cause of the problem. In addition, there are concerns about structural movement to the stair tower and this is being monitored. Below ground drainage works may be needed if found to be contributing to movement. (HE 2020)

NCC Survey Date: NA 

Church of St Swithun

tall grey church with square tower

Site Name: Church of St Swithun,
Churchgate
Grade: II*
Parish: Retford (East Retford)
Overall Condition:  Poor (HE 2020)
NCC Risk Category: NA 

Historic England assessment:
The church has been suffering from many leaks. Nave and aisle roof coverings were repaired with a National Lottery Heritage Fund grant in 2010 and a second phase of repairs to transept roofs and tower was completed in 2014. Further roofing and masonry repairs still urgently required in other areas, and this will be carried out as funding allows. The church has been subject to heritage crime. (HE 2020)

NCC Survey Date: NA 

Parish Church of St Michael the Archangel

Site Name: Parish Church of St Michael the Archangel, Bridgegate.
Grade: II*
Parish: Retford (West Retford)
Overall Condition:  Poor (HE 2020)
NCC Risk Category: NA 

Historic England assessment:
Masonry is generally in fair condition but there are poor parapet abutment details
and various localised repairs are evident. There is significant
erosion of jamb stones and jointing to south porch arch
and gable. Roof coverings leak at abutments and there is
water ingress damage internally. A Listed Places of Worship Roof Repair Fund grant enabled roofs and rainwater goods to be repaired in 2016. Other work is
needed.
 (HE 2020)

NCC Survey Date: NA 

East Stable and Outbuildings at Shireoaks Hall

two square buildings with grass and a tree

Site Name: East Stable and Outbuildings at Shireoaks Hall
Grade II*
Parish: Shireoaks
Overall Condition: Very Bad (HE 2020) 
NCC Risk Category: 

Historic England assessment:
There are many slipped , broken and displaced slates on the roof. Masonry is open jointed, cracked and displaced particularly in locations where the downpipes used to be. The building is shrouded in vegetation and a self-set sapling is growing through the roof. The outbuildings are in a ruinous state. (HE 2020)

NCC Survey Date: NA 

Shireoaks Hall

Grey square building with boarded up windows over three floors

Site Name: Shireoaks Hall
Grade II*
Parish: Shireoaks
Overall Condition: Very Bad (HE 2020)
Risk Category: 

Historic England assessment:
The hall has been much altered historically and there are a number of significant cracks. There is some loose stonework at high level with some sections at risk of imminent collapse. Roofs are in poor condition. The rainwater disposal is ineffective and undersized. The north elevation is shrouded in vegetation. The outbuildings are partially collapsed. Internally, some areas of ceiling plaster have failed. (HE 2020)

NCC Survey Date: NA 

West Stable and Outbuildings at Shireoaks Hall

two square buildings with grass and a tree

Site Name: West Stable and Outbuildings at Shireoaks Hall

Grade II*

Parish: Shireoaks

Overall Condition: Very Bad (HE 2020) 

Risk Category: 

Details:  A pair to the East Stable. There are many slipped , broken and displaced slates on the roof. Past slate repairs are now failing and the north ridge is missing. Masonry is open jointed, cracked and displaced particularly in locations where the downpipes used to be. The stable and outbuildings are shrouded in vegetation. (HE 2020)

Survey Date: NA

Arch at Serlby Park

black and white photo of tree cover arch-ruin

Site Name: Arch at Serlby Park

Parish: Styrrup with Oldcoates

Grade II*

Overall Condition: Poor (HE 2020) 

Risk Category: 

Details:  The stonework is heavily eroded in places, particularly to the southern elevation and the voussoirs. There is extensive open mortar jointing across most elevations. Self-seeded trees require removal, however extensive ivy growth has been removed and cleared from the vicinity of the structure. (HE2020)

Survey Date: 

Worksop Priory Gatehouse

brown building with red roof and cross outside of archway

Site Name: Worksop Priory Gatehouse

Grade I

Parish: Worksop

Overall Condition: 

Risk Category: 

Details: The gatehouse requires comprehensive repair, as demonstrated by a condition survey funded by grant aid from Historic England. An initial body of repairs focusing on the shrine, funded by a Repair Grant for Places of Worship, was completed summer 2016. Further repairs are needed to the interior, exterior stonework, rainwater goods and statues. Options for future uses and funding possibilities are being explored. (HE 2020)

Survey Date: 

Church of St. John

Site Name: Church of St. John, Gateford Road.

Grade II

Parish: Worksop

Overall Condition: Poor (HE assessment) 

Risk Category: N/A (Not assessed by NCC)

Details: (Stone erosion at high level.  Steeplejack inspection in 2021 revealed a range of defects inclusing some movement. (Source HE 2021)

Survey Date: Non NCC survey in 2021 source HE)

District: Broxtowe

Bennerley Viaduct

iron viaduct overhead

Site Name: Bennerley Viaduct, Awsworth
Road

Grade II*

Parish: Awsworth

Overall Condition: 

Risk Category: 

Details: Disused for decades, there was unchecked deterioration and a lack of maintenance. Historic England provided advice to inform consents for repairs and the construction of a foot/cycle path across the viaduct. An application to the National Lottery Heritage Fund in 2017 for this major project was not successful. Historic England awarded a two stage grant in January 2019; development work completed in 2019 and essential repairs commenced in March 2020. Work was temporarily stopped due to Covid-19 but re-started in May 2020.(HE 2020)

Survey Date: 

Willoughby Alms-houses and adjoining Boundary Wall

Almshouses with triangular rooves, a chimney and red doors

Site Name: Willoughby Almshouses and
adjoining Boundary Wall,
Church Lane

Grade II*

Parish: Cossall

Overall Condition: 

Risk Category: 

Details: There are some open joints in the copings on the gables and at parapet level. The houses have been boarded up and would benefit from better ventilation. The interiors are suffering from damp and damp related issues. (HE 2020)

Survey Date: 

Summerhouse at the Yews, Kimberly Road

gateway with large arch door and two round corner towers

Site Name: Summerhouse at the Yews, Kimberly Road

Grade II*

Parish:  Nuthall

Overall Condition: 

Risk Category: 

Details: Significant vegetation growth around and over roofs into upper gutters. Loss of roof covering allowing structural timber decay and localised instability in decayed masonry, particularly the rear gable masonry which is at risk of collapse if continued water ingress is not prevented.(HE 2020)

Survey Date: 

District: Newark and Sherwood

Overall Condition: Very Bad

Blidworth Windmill

round brick building with two windows, no glass, and no roof

Site Name: Blidworth Windmill

Parish: Blidworth

Overall Condition: Very Bad

Risk Category: 1

Details: Top courses of bricks missing.  No roof, vegetation growing on the inside walls, render coming away, windows not glazed.

Survey Date: 09.06.2017

Pigeoncote at Willingham House

square overgrown reb brick building with green tarp on roof

Site Name: Pigeoncote at Willingham House

Parish: Cromwell

Overall Condition: Very Bad

Risk Category: 1

Details: Roof removed and gables taken down.  Climbing plant to NW corner and over tarp and upper courses of bricks.  Silver birch tree close to northern wall.

Survey Date: 09.11.2017

Sundial 5 metres South of South Transept of Church of St Mary, Tuxford Road

Site Name: Sundial 5 metres South of South Transept of Church of St Mary, Tuxford Road

Parish: Egmanton

Overall Condition: Very Bad

Risk Category: 1A

Details: 2013 photo shows none of the problems encountered in 2017.  Sundial has collapsed and top section has fallen off and is in 3 pieces and appear to lay where they fell.  Standing section of the stone shaft is flaking and eroded.  Climbing plants to the base.  Remains of upright scattered around base.  Base stones are coming apart from each other, possible due to ivy growth.

Survey Date: 15.06.2017 

Gypsum Grinding Mill

Overgrown red brick building with no windows, door or roof

Site Name: Gypsum Grinding Mill

Parish: Hawton

Overall Condition: Very Bad

Risk Category: 1

Details: In a roofless derelict state.  No doors or windows.  Large part of the walls missing.

Survey Date: 23.06.2017

Mile Stone, Mansfield Road

Site Name: Mile Stone, Mansfield Road

Parish: Hockerton

Overall Condition: Very Bad

Risk Category 1A

Details: Missing

 Survey Date: 09.06.2017

Railing and Gate at No 6, Main Street

iron railing overgrown by fir hedge

Site Name: Railing and Gate at No 6, Main Street

Parish: Kelham

Overall Condition: Very Bad

Risk Category: 1A

Details: Railings almost completely obscured and within conifer hedge.  The bottom of the railings are visible in places and where they can be seen are in a very bad state and have completely corroded leaving gaps between the uprights and the bottom rail.

 Survey Date: 02.06.2017

Beacon Hill Tollhouse

boarded up building with tall chimney

Site Name: Beacon Hill Tollhouse, Beacon Hill Road

Parish: Newark

Overall Condition: Very Bad

Risk Category: 1

Details: Part demolished.  Windows boarded and infilled.  Rainwater goods failing.

Date: 28.07.2017

Boundary Wall and Gate at Church of the Holy Rood

Red brick wall along grass, overgrown by ivy

Site Name: Boundary Wall and Gate at Church of the Holy Rood, Church Lane

Parish: Ossington

Overall Condition: Very Bad

Risk Category: 1A

Details: SE end is being pushed forward by the earth and ivy it is retaining.  Covered almost to the base with ivy.  SE end starting to collapse and bricks loose.  Very deeply recessed mortar in places.  Erosion to bricks either side of the gateway.  Large Laurel NW of the gateway on the outside of the wall.  Mature Sycamore tree on the inside at NW end.

Survey Date: 29.06.2017

Monumental Well at Ossington Hall

Site Name: Monumental Well at Ossington Hall, Grange Farm Lane

Parish: Ossington

Overall Condition: Very Bad

Risk Category: 1A

Details: Roof covered in part with moss.  Terracotta freezes on exterior severely weathered some dentils missing.  Capitals worn esp. on SE column.  Algae growth to column bases.  Base stones displaces and covered in moss.  Overgrown and vegetation is overhanging.  Interior nicely preserved.

 Survey Date: 29.06.2017

Pillarbox Opposite Woodland View, The Lane

Site Name: Pillarbox Opposite Woodland View, The Lane

Parish: Perlethorpe cum Budby

Overall Condition: Very Bad

Risk Category: 1A

Details: Stolen,  replacement in place but still wrapped in plastic.

Survey Date:  21.03.2017

Urn in Ice House Wood

Site Name: Urn in Ice House Wood

Parish: Perlethorpe cum Budby

Overall Condition: Very Bad

Risk Category: 1A

Details: Not Located.  Area landscaped

 Survey Date: 24.11.2017

Ice House on Island at East end of Lake

Site Name: Ice House on Island at East end of Lake

Parish: Perlethorpe cum Budby

Overall Condition: Very Bad

Risk Category: 1A

Details: Not located.  Area now landscaped.

 Survey Date: 24.11.2017

Garden Urn at Castle View

Site Name: Garden Urn at Castle View, Main Street

Parish: Perlethorpe cum Budby

Overall Condition: Very Bad

Risk Category: 1A

Details: Missing as in 2003 survey.

 Survey Date: 24.11.2017

Sundial 150 metres south of Thoresby Hall

Site Name: Sundial 150 metres south of Thoresby Hall

Parish: Perlethorpe cum Budby

Overall Condition: Very Bad

Risk Category: 1A

Details: Removed, missing

Survey Date: 24.11.2017

South Lamp at West Gate at Church of St. John

Parish: Perlethorpe cum Budby 

Overall Condition: Very Bad

Risk Cat: 1A

Site Name: South Lamp at West Gate at Church of St. John

Details: In 2003 – In two pieces on the floor next to gate, heavily corroded. In 2017 – Reused as flagpole base.

Survey Date: 24.11.2017

Ruins of Old Church in Churchyard, Top Road

Site Name: Ruins of Old Church in Churchyard, Top Road

Parish: Thorney

Overall Condition: Very Bad

Risk Category: 1A

Details: Arch no. 1 is virtually destroyed, remains covered with ivy. Arches no. 2 and 3 recently restored although some stone flaking on arch no. 3. ‘At risk’ only applies to arch no. 1.

 Survey Date: 24.08.2013

Triple and Single Chest Tombs 2 metres South of Chancel at Church of St Swithin

two tombs with some weeds

Site Name: Triple and Single Chest Tombs 2 metres South of Chancel at Church of St Swithin, Potter Lane

Parish: Wellow

Overall Condition: Very Bad

Risk Category: 1A

Details: The third of the triple chest tomb closest to the church has been dismantled or knocked down and is laid upside down.  The ground beneath is disturbed.  South face of the tomb is badly eroded.  The single chest tomb has ivy growing on it and the inscription is still visible.  Possible inscription on long side worn away.  One tomb has side missing and is open.

Survey Date:  18.07.2017

Stable Block at Winkburn Hall

Site Name: Stable Block at Winkburn Hall, Winkburn Hall Drive

Parish: Winkburn

Overall Condition: Very Bad

Risk Category: 1A

Details: Large areas of brickwork need pointing.  Downpipes blocked and causing staining to brickwork etc.  Windows missing, many without glass or have broken panes, door missing to south west elevation.  Crack south west elevation over window

 Survey Date: 08.03.2014 

Overall Condition: Poor

Windmill at Mill Farm

Site Name: Windmill at Mill Farm, Sand Lane

Parish: Besthorpe

Overall Condition: Poor

Risk Category: 3

Details: Brickwork in poor condition.  Missing bricks and stepped cracking.

Survey Date: 09.11.2017

Row of 8 Headstones and Memorial Cross 15 metres South of the Church of St Mary of the Purification

8 headstones and memorial cross, all pale stone, with path in front

Site Name: Row of 8 Headstones and Memorial Cross 15 metres South of the Church of St Mary of the Purification, Main Street

Parish: Blidworth

Overall Condition: Poor

Risk Category: 3A

Details: Algae and moss growing on both the cross and headstones.  One stone partly legible, and two are covered in moss and illegible.

 Survey Date: 09.06.2017

Friar Tuck’s Well

pile of logs in wood with some broken railings

Site Name: Friar Tuck’s Well, Black Scotch Lane

Parish: Blidworth

Overall Condition: Poor

Risk Category: 3A

Details:  The well located to the side of the cascade and is now buried.  The railings are no longer in place.

Survey Date: 09.06.2017

Gateway 8 metres North East of the Church of St Mary of the Purification

brown square stone gateway with black iron gates

Site Name: Gateway 8 metres North East of the Church of St Mary of the Purification, Main Street

Parish: Blidworth

Overall Condition: Poor

Risk Category: 3A

Details: Stone badly eroded on lintel on road side and on inside of piers.  Gates in fair order painted but rusting slightly where cracks have appeared.

 Survey Date: 09.06.2017

Flight of Steps and Gateway at Fountain Dale House

Overgrown plants with just visible stonework

Site Name: Flight of Steps and Gateway at Fountain Dale House, 40 metres South East of the House, Ricket Lane

Parish: Blidworth

Overall Condition: Poor

Risk Category: 3A

Details: Wrought iron railings in poor condition.  Very overgrown to the west side.  Gates and metal work has peeling paint and is rusting.  Stone gate piers in fair order with moss to the obelisks. 

Survey Date: 09.06.2017

Row of 17 Headstones 2 metres East of the Chancel of Church of St Mary of the Purification

17 headstones along flagged path with tree behind

Site Name: Row of 17 Headstones 2 metres East of the Chancel of Church of St Mary of the Purification, Main Street

Parish: Blidworth

Overall Condition: Poor

Risk Category: 3A

Stones 10th and 12th from the road end completely covered in moss.  Legibility of inscriptions varies from fair to very bad.

 Survey Date: 09.06.2017

Boundary Wall, Gate Piers and Gates at Carlton Hall

curved red brick wall with large crack running downwards

Site Name: Boundary Wall, Gate Piers and Gates at Carlton Hall, Church Street

Parish: Carlton on Trent

Overall Condition: Poor

Risk Category: 3A

Details:  Areas of spalling and salts present.  Deeply recessed bricks and larges patches of lichen growth.  The gate to the north is damaged and missing a section at the base.  Deeply eroded brickwork due to water from lean to shed.  Bulging in places.  Substantial crack and bulging caused by Buddleia.  One section has been replaced by breeze blocks.  Large crack to corner and missing capstones.

Survey Date: 15.06.2017

Headstocks and Powerhouse at the Site of the Former Clipstone Colliery

colliery with two metal towers and red brick building

Site Name: Headstocks and Powerhouse at the Site of the Former Clipstone Colliery

Parish: Clipstone

Overall Condition: Poor

Risk Category: 3

UPDATE:Headstocks and topple zone sold to Adco Properties Ltd in Dec 2020.  New owners are actively tackling safety maintenance and clearing up jobs.  Future works planned to make roofs watertight and re-glaze the engine house.  Owners in active discussions with stakeholders regarding funding bids and future public access. JM  March 2021

Details: Broken windows.  Mature vegetation growing from roof and walls.  

Survey Date: 21.07.2017

Station House

Station House Collingham, brown stone building with round arched windows in front of a platform

Site Name: Station House, Station Road

Parish: Collingham 

Overall Condition: Poor

Risk Category: 3

Details: Canopies missing above pillars and arcades. Broken windows in central and east bay are boarded. Brickwork cracked below central bay window.  Breeze block in filled windows to side of central bay.

Survey Date: 21.03.2018

House adjoining the Cross Shop

red brick house, white windows, red bus shelter in front

Site Name: House adjoining the Cross Shop, High Street

Parish: Collingham

Overall Condition: Poor

Risk Category: 3

Details: Windows rotten and boarded.  Latticework  porch broken at the base.  Rainwater good in poor condition with evidence of damp to brickwork.  Shop front rotten and coming away from wall.  Roof of adjoining shed falling in.

 Survey Date: 21.03.2018

Group of 4 Chest Tombs in Churchyard 2 metres South of Church of St Oswald

3 square stone tombs in grass

Site Name: Group of 4 Chest Tombs in Churchyard 2 metres South of Church of St Oswald, School Lane

Parish:  East Stoke

Overall Condition: Poor

Risk Category: 3A

Details:
Tomb 1: Illegible inscription and west end stone missing.  North face is damaged to the  east corner. 
Tomb 2: All sides intact.
Tomb 3: East side stone has fallen open and leans up against tomb 4.  Tomb 4: Inscription partly legible.  Sinking to the east end and leaning to the south.

Survey Date: 23.06.2017

Pair of Head Stones in Church Yard of Church of St Giles

several headstones under shade, words indistinguishable

Site Name: Pair of Head Stones in Church Yard of Church of St Giles 5 metres North of the Chancel, Main Street

Parish: Edingley

Overall Condition: Poor

Risk Category: 3A

Details: Partly legible.  Both stone reduced in size to just leave the date.  Both stones have sunk.  

 Survey Date: 02.06.2017

Springs Farm Barn and Mill

Site Name: Springs Farm Barn and Mill, Station Road

Parish: Edingley

Overall Condition: Poor

Risk Category: 3

Details: Roofs have substantial moss growth and a few slipped tiles.  Rainwater goods broken and missing and vegetation growing in gutters.  Door rotten with lower parts of the timber removed and left open.  Stone steps on brick, brickwork showing signs of cracking with some crude cement repointing.  Some spalling next to steps.  Windows to attached building have many broken panes of glass and many ridge tiles missing.  Walls overgrown with ivy.

Survey Date: 02.06.2017 

Monument to a Horse

Site Name: Monument to a Horse, Worksop Road

Parish: Edwinstowe

Overall Condition: Poor

Risk Category: 3A

Details: Ball finial missing and capital missing large chunk. Column is pockmarked and any original ‘signature’ inscription has disappeared. Some etched graffiti.

 Survey Date: 09.11.2017

Edwinstowe Hall

large grey hall with white windows and grey roof, plants growing up walls

Site Name: Edwinstowe Hall, Church Street

Parish:  Edwinstowe

Overall Condition: Poor

Risk Category: 3

Details: Render is coming away in places, especially on chimneys and near roof.  Sash windows peeling.  Mature vegetation growing through lean to roof.  Mature vegetation growing out of wall and filling gutters and hoppers.

Survey Date: 21.07.2017

Barn and attached Outbuilding at the Old House

red tile roof in disrepair

Site Name: Barn and attached Outbuilding at the Old House, Main Street

Parish: Epperstone

Overall Condition: Poor

Risk Category: 3

Details: Outbuilding roof missing tiles and undulating.  Lack of guttering on main barn and blocked guttering on outbuilding.  Walls – Some missing pointing, small areas of spalling.  Vegetation growing against south wall.  Spray/salt damage along roadside wall.  Some rot at top of double door.  

 Survey Date: 01.06.2017 

Sundial in Church Yard of Church of St Michael

Site Name: Sundial in Church Yard of Church of St Michael, 7 metres South of the South East Aisle, Main Street

Parish: Farnsfield  

Overall Condition: Poor

Risk Category: 3A

Details: Upright only remains, showing significant lichen growth on the south side.  Surface of the stone has lifted and will fall away if touched.

Survey Date: 02.06.2017

The Pinfold, Copper Hill

curved wall, white on bottom half, red brick at top

Site Name: The Pinfold, Copper Hill

Parish: Grassthorpe

Overall Condition: Poor

Risk Category: 3A

Details: Deeply recessed mortar in places and some loose bricks.  Loose coping stones.  Crack to the SE corner. Climbing plants up inside of walls.

 Survey Date: 15.06.2017

Mill and attached House and Bridge

broken wooden door in archway, with ivy

Site Name: Mill and attached House and Bridge, Halam Hill

Parish:  Halam

Overall Condition: Poor

Risk Category: 3 

Details: Mill wheel and pit in poor condition. Vegetation around mill wheel is affecting the structure.  Windows rotten through and mill door base and timber lintel have rotten. Bridge accessible but overgrown.  Mill building overshadowed by very close growing and dense vegetation.  House: Rainwater goods broken.  Roof sagging and a few slipped tiles.

Survey Date: 09.06.2017 

Church of St. Nicholas

whitish church wall with ivy overgrown

Site Name: Church of St. Nicholas, Church Lane

Parish: Hockerton

Overall Condition: Poor

Risk Category: 3

Details: Guttering damaged in all locations and full of vegetation.  East chancel wall severe subsidence crack.  West door stone eroded.  Vegetation growing from buttress on S side of nave.  S porch gutter failed and causing deterioration of stone on west side of porch.  Very overgrown to the north side of the church causing shade, walls here covered in algae and ivy.  Moss to north inside of chancel roof.

 Survey Date: 09.06.2017 

Stable Block to the West and Slightly North of Holme Hall

red brick building with large black door

Site Name: Stable Block to the West and Slightly North of Holme Hall, Main Street

Parish: Holme

Overall Condition: Poor

Risk Category: 3 

Details: Gutters filled with mature vegetation, cracked in places and hanging down in other places.  Brickwork to NW corner badly eroded to the lower courses.  Needs rainwater good maintaining to prevent further deterioration.  Currently part of stable yard.

Survey Date: 23.06.2017

Village Cross

Site Name: Village Cross, Main Street

Parish: Holme

Overall Condition: Poor

Risk Category: 3A 

Details: Just over a foot remains of the upright plus the base.  Covered in lichen growth.  Base cracked and section missing on the north edge.  What remains appears stable as no discernible change from 1984 photo.

 Survey Date: 23.06.2017 

Seven Garden Urns at Kelham Hall

Site Name: Seven Garden Urns at Kelham Hall, Averham Road

Parish: Kelham

Overall Condition: Poor

Risk Category: 3A

Details: Numbered from east to west: 1)(poor) large chunk of terracotta (cable mould) missing beneath bowl face.  2) (fair)several perpendicular cracks on terracotta  3) (fair)loose piece and corner piece missing 4) (poor)repair is ugly, bowl has a lot of cracks 5) (poor)bowl good, bowl and middle is unstable, cement repairs are ugly 6) (poor)concrete has weathering, bowl lugs damaged 7) (good)rose detail, incrustation, bowl intact, best condition out of all urns.

Survey Date: 02.06.2017

36 Railing Piers at Kelham Hall

wall by road

Site Name: 36 Railing Piers at Kelham Hall, Main Street

Parish: Kelham 

Overall Condition: Poor

Risk Category: 3A

Details: Piers numbered from west (river Trent end) to east.  Ivy on piers 1, 3, 18, 19, 21, 24 and 26. Brickwork loose and/or missing piers 8,9,16,23 and 25.  Pier 13 is  twisted.  Pier 7 shows deeply recessed pointing to the lower half.

 Survey Date: 02.06.2017

Ivy Farmhouse and Cottage

row of red brick cottages

Site Name: Ivy Farmhouse and Cottage, Newark Road

Parish: Kirklington

Overall Condition: Poor

Risk Category: 3

Details: 
Severe subsidence crack to south wall.  SW corner of building rebuilt following vehicle impact.   Vegetation goring up and close to front elevation.  Window and door frames rotten and paint peeling, timber of fan light rotting.  Gutter broken and hanging off. Railings are rusty and need painting.  Gate bent out of shape.

Survey Date:  09.06.2017

Cross 12 metres South of Church of St Michael

Site Name: Cross 12 metres South of Church of St Michael, Main Street

Parish: Laxton and Moorhouse

Overall Condition: Poor

Risk Category: 3A

Details: Top section and half of the shaft is cracked through and repaired.  Stone of shaft is flaking.  Base stones separating, some ivy growth and covered in moss to the NW side.

 Survey Date: 21.07.2017

Barn at Brockilow Farmhouse

Site Name: Barn at Brockilow Farmhouse, off Kersall Road

Parish: Laxton and Moorhouse 

Overall Condition: Poor

Risk Category: 3

Details: Cracked/missing ridge mortar.  Wall damaged to, probably hit by farm vehicle.  Tiles lifting at north end of roof, missing tiles to the rear.  Gutter missing in places and falling away in others.  Vents blocked.  Loose brickwork under eaves at rear of barn.

Survey Date:  21.07.2017

Old Bar Farmhouse

large red brick building with small white windows and white door

Site Name: Old Bar Farmhouse, Bar Road

Parish: Laxton and Moorhouse

Overall Condition: Poor

Risk Category: 3

Details: West gable end has ivy growing to second floor level.  Areas of deeply recessed mortar to lower courses.  East gable end ivy growing.  Brickwork and eaves sagging over east window, crack runs from this window to the ground floor.  Windows rotten.

 Survey Date: 21.07.2017

Gate Piers and Gate at Church of St Michael

whitewashed stone gate pier with grey pyramid top

Site Name: Gate Piers and Gate at Church of St Michael, Main Street

Parish:  Laxton and Moor House

Overall Condition: Poor

Risk Category: 3A

Details: Severely weathered stonework to gate piers.  Railings in fair order but need painting.

Survey Date: 21.07.2017

8, London Road

3 storey white building

Site Name: 8, London Road

Parish: Newark

Overall Condition: Poor

Risk Category: 3

Details: Colourwash stained. Evidence of damp above door hood.  Down pipe corroded and split.  Gutter blocked.  Paint peeling off lower courses of the façade.  Extensive peeling of window paint.

 Survey Date: 28.07.2017 

6 and 8, Portland Street

row of white houses with boarded lower windows

Site Name: 6 and 8, Portland Street

Parish:  Newark

Overall Condition: Poor

Risk Category: 3

Details: Gutter full of vegetation and no downpipe.  Ground floor windows boarded.  Substantial crack to wall to the right of the central door.  Paint peeling and neglected.  Colour-washed render currently in a poor state.

Survey Date: 28.07.2017

Trent Bridge, Beast Market Hill

stone arched bridge with multiple arches, green railings above

Site Name: Trent Bridge, Beast Market Hill

Parish: Newark

Overall Condition: Poor

Risk Category: 3A

Details: Damage to archway; stone damaged and evidence of breezeblock and cement repair.  Packing underneath which was originally under cement now exposed and possibly loose.  Stone work missing above one cut water.  Vegetation growing to the cut waters and along metal work and piers.  Extensive graffiti under archway over foot path.  Worn and stained stonework.

 Survey Date: 14.09.2017

37 and 39, Kirkgate

black and white building with boarded windows

Site Name: 37 and 39, Kirkgate

Parish: Newark

Overall Condition: Poor

Risk Category: 3

Details: Render coming away from underside of jetty in St. Leonard’s Court passageway reed and plaster is exposed.  Most windows boarded but one unbarred first floor window has 2 panes smashed.

 Survey Date:  25.07.2017

Causeway Culvert 135 metres North West of Level Crossing

causeway culvert - curved brick wall with small arches

Site Name: Causeway Culvert 135 metres North West of Level Crossing, Great North Road

Parish: Newark 

Overall Condition: Poor

Risk Category: 3A

Details: Large crack through the coping stone and down through the wall which is bulging away from the road.  Sloping bricks under coping stones are badly damages.  Brick to archway pillars eroded.  Large tree growing out of south end and tree stump within brickwork at north end.

Survey Date: 04.08.2017

Causeway Arches and Embankment Walling 50 metres North West of Trent Bridge

red brick wall with buttresses, lamppost in front

Site Name: Causeway Arches and Embankment Walling 50 metres North West of Trent Bridge, Great North Road

Parish: Newark

Overall Condition: Poor

Risk Category: 3A

Details: Some mortar joints facing road have failed.  Weathering to some sections of coping.  Wrought iron gate and other metal work have minor corrosion fan grill to one side of the gate way is missing.  Bricks severely eroded on car park side and some joints have no mortar and it is possible to see through to the other side.  The tops of some buttresses are missing. Vegetation growing along the entire base of the wall on the car park side.

 Survey Date: 25.09.2017

Former Corn Exchange

white building with three large arched doorways, sone railings and monument above

Site Name: Former Corn Exchange, Now Silverline Bingo, 18, Castlegate

Parish: Newark 

Overall Condition: Poor

Risk Category: 3

Details: Water damage and vegetation present around moulded cornice.  Glazing in tower cracked. Parts of stonework heavily stained with lower section becoming quite worn. NW and NE elevations – Rainwater good blocked.  Windows smashed.  Architectural detail worn.

Survey Date: 25.07.2017

Maltings 70 metres North West of Northgate Brewery

red brick buildings with grey funnels on roof

Site Name: Maltings 70 metres North West of Northgate Brewery, Northgate

Parish: Newark

Overall Condition: Poor

Risk Category: 3 

Details: Doors infilled with breeze blocks.  Rust staining to roof from metal finials.  Bricks of the second floor decorative band are eroding.  Glazing smashed, windows and doors have bars.  Site well secured and for sale.

 Survey Date: 28.07.2017

Farndon Windmill

Site Name: Farndon Windmill, Crees Lane

Parish: Newark

Overall Condition: Poor

Risk Category: 3

Details: Windows missing. Door rotting and boarded over. Walls have very deeply recessed mortar and have areas of severe spalling next to first and second floor windows with some repointing below.  Odd bricks missing.  Windows all unglazed, metal frames survive, vegetation growing on window sills.  Key stone reading JD 183? (3or8)

Survey Date: 28.07.2017 

8, 8a, 8b, Lombard Street

white fronted building, shop at base

Site Name: 8, 8a, 8b, Lombard Street

Parish: Newark

Overall Condition: Poor

Risk Category: 3

Details: Gable end bowed and chimney stack leaning.  One boarded up window to the right of the main entrance and one large pain of glass on the frontage cracked.

 Survey Date: 18.05.2017

Boundary Wall and Gate piers to the Friary

stone wall alongside a road

Site Name: Boundary Wall and Gate piers to the Friary, Appleton Gate

Parish: Newark

Overall Condition: Poor

Risk Category: 3A

Details: Wall is heavily worn at various sections along its length. Extensive repairs are evident though still large proportions of heavily worn stone can be seen.  Gate and gate piers are in good condition and appear to have been renovated.

Survey Date: 13.09.017

25 and 27, Balderton Gate

two shop fronts in red brick building

Site Name: 25 and 27, Balderton Gate

Parish: Newark

Overall Condition: Poor

Risk Category: 3

Details: Two shops.  25 is vacant and for sale.  Windows in poor condition at No. 25.

 Survey Date: 25.07.2017

Railing and Gate to Left of 26 and 28, Millgate

railing with missing rail, garden behind

Site Name: Railing and Gate to Left of 26 and 28, Millgate

Parish: Newark

Overall Condition: Poor

Risk Category: 3A

Details: Some railings and 6 finials missing.  Largely covered by vegetation at the SW end.  Needs painting. 

Survey Date: 15.09.2017

Beaumond Cross

tall slim grey cross with stepped base, benches at base

Site Name: Beaumond Cross, London Road

Parish: Newark

Overall Condition: Poor

Risk Category: 3A

Details: Figure and surrounding enclave severely eroded.  Brass plaques not present.

 Survey Date: 28.07.2017

Remains of Newark Castle

dark grey stone wall corner, with lighter renovations at base

Site Name: Remains of Newark Castle, Castlegate

Parish: Newark

Overall Condition: Poor

Risk Category: 3A

Details: Ivy and other vegetation growing from the river side wall.  Central buttress showing signs of erosion and blackening, severe erosion in places.  NE end buttress on river side has algae and moss growth.  There is considerable amounts of vegetation growing from the wall inside the tower.  There is graffiti on the window jambs and in the arches on the river side wall.

Survey Date: 25.07.2017 

North Road House

trees with white wall behind

Site Name: North Road House, Waltons Lane

Parish: North Muskham

Overall Condition: Poor

Risk Category: 3

Details: Ivy growing up walls. Surrounded by dense vegetation.

 Survey Date: 29.06.2017

Outbuilding at North Road House

Site Name: Outbuilding at North Road House, Waltons Lane

Parish: North Muskham

Overall Condition: Poor

Risk Category: 3

Details: 2013 assessment: Roof sagging and tiles displaced , rear wall shows major signs of leaning and damage, area to the back is massively overgrown and shows major signs of neglect. 
2017 Survey: Property now too overgrown to survey.

Survey Date: 29.06.2017 

Railings and Gate at North Road House

Site Name: Railings and Gate at North Road House, Waltons Lane

Parish: North Muskham

Overall Condition: Poor

Risk Category: 3A

Details: Railings almost completely concealed behind dense evergreen vegetation. Where they are visible by the gate they are rusty with peeling paint. Wooden gate intact. Gate piers in dense vegetation.

Survey Date: 29.06.2017

Ollerton Hall

large red brick buildings behind a red brick wall, road in foreground

Site Name: Ollerton Hall, Main Street

Parish: Ollerton and Boughton

Overall Condition: Poor

Risk Category: 3

Details: Most windows boarded up the few that haven’t been like the roof dormers and Velux have been smashed.

Survey Date: 21.07.2017

Tomb Chest of Robert Sherbrooke

white stone tomb chest inside broken iron railings

Site Name: Tomb Chest of Robert Sherbrooke adjacent the East Side of Workshops in Former Wood Yard of Oxton Hall, Blind Lane

Parish: Oxton

Overall Condition: Poor

Risk Category: 3A

Details: Iron railing corroded.  At one corner the plinth is broken and the corner rail with urn top is lying beside the tomb.  Missing 4 railings, one has been placed against the tomb.  Tree is lifting the edge and is likely to cause more damage.  Plinth stone broken and corner missing. Inscription faded.

 Survey Date: 01.06.2017

Terrace Walls and Gazebos at Thoresby Hall

grey stone walls

Site Name: Terrace Walls and Gazebos at Thoresby Hall

Parish: Perlethorpe cum Budby

Overall Condition: Poor

Risk Category: 3A

Details: Large amount of movement in areas of wall.  

Survey Date: 18.11.2013

Barn and Stables to North of Ceres Lodge Farmhouse

Site Name: Barn and Stables to North of Ceres Lodge Farmhouse

Parish: Perlethorpe cum Budby

Overall Condition: Poor

Risk Category: 3

Details: Roof slipped Westmorland slates, rainwater goods hanging off.  Glazing in windows smashed.

 Survey Date: 18.11.2013

North Lamp at West Gate at Church of St John

black lamp on stone base in front of iron railings, between trees

Site Name: North Lamp at West Gate at Church of St John, Church Lane

Parish: Perlethorpe cum Budby

Overall Condition: Poor

Risk Category: 3A

Details: Stone base and upright covered in algae.  Ivy to lower part of posts.  Glass removed from lantern.  The design between the post and the lantern is very fine and bending causing the metal lamp frame to lean.

Survey Date: 24.11.2017

Monument to Nelsons Navy

Site Name: Monument to Nelsons Navy 

Parish: Perlethorpe cum Budby

Overall Condition: Poor

Risk Category: 3A

Details: Stone in fair order but inscription becoming illegible.  Overgrown with overhanging rhododendron bushes.

 Survey Date: 24.11.2017

Mill at Mill Farm

Site Name: Mill at Mill Farm, Mill Farm Lane

Parish: Rolleston

Overall Condition: Poor

Risk Category: 3

Details: Front and rear gutters completely full of mature vegetation.  Granary buildings is no longer water tight and roof and top courses of wall are coming away from the mill building.  Windows unglazed or with rotten frames.  Pigeons present in both buildings and floors covered in guano.

Survey Date: 16.06.2017

Sunnyside, Staythorpe Road 

red brick building, five bar gate and low wall in front

Site Name: Sunnyside, Staythorpe Road 

Parish: Rolleston  

Overall Condition: Poor

Risk Category: 3

Details: Roof ridge is slanted. Vegetation growing in rainwater goods. Vegetation and cracking on walls.  Rot and mould on windows.  Door in poor condition.  Bricks missing on gable end.  Rotten windows, ivy growing inside window. Boundary wall damaged and in other areas is badly eroded and parts have been rebuilt, capping coping bricks missing in places.

 Survey Date: 16.06.2017 

Sundial in Churchyard 11 metres South of the Porch of Church of Holy Trinity

Site Name: Sundial in Churchyard 11 metres South of the Porch of Church of Holy Trinity, Station Road

Parish: Rolleston

Overall Condition: Poor

Risk Category: 3A

Details: Inscription illegible.  Plinth has cracks in stone and is leaning.  Sundial lead is missing.  Spores/fungi/vegetation growing.

Survey Date: 16.06.2017

Boundary Wall at Church of St Wilfrid

white stone wall leading to black gate

Site Name: Boundary Wall at Church of St Wilfrid, Church Lane

Parish: South Muskham

Overall Condition: Poor

Risk Category: 3A

Details: Mature ivy growing within the walls lifting off the coping stones in places.  Severe stone erosion north of the gate. Inscription on gate becoming hard to read.  Some poor pointing to coping stones.  Inside gravestones and vegetation are in close proximity to walls.  South gate piers covered in ivy.

 Survey Date: 29.06.2017

Park View House, 28, Westgate

overgrown wall in front of a house

Site Name: Park View House, 28, Westgate

Parish: Southwell

Overall Condition: Poor

Risk Category: 3A

Details: Recessed mortar to stone wall.  Lots of vegetation growing out of the front of the wall.  Both gate piers are cracked.

Survey Date: 26.05.2017

Garden Temple

Site Name:  Garden Temple Approximately 450 metres South West of Norwood Park

Parish: Southwell

Overall Condition: Poor

Risk Category: 3A

Details: Plastic gutters – full of leaves.  Pediment looks renewed/not original.  Plywood repairs to bases of both pilasters and around the capital on RHS are rotting.  Extensive ivy growth – walls need patch pointing.  Large Sycamore growing to RHS is too close.  Interior: some signs of re-plastering which needs lime washing.  Broken flagstones.

 Survey Date: 08.07.2017

Ha-ha Approximately 75 metres South and East of Norwood Park

Site Name: Ha-ha Approximately 75 metres South and East of Norwood Park

Parish: Southwell

Overall Condition: Poor

Risk Category: 3A 

Details: Middle section very overgrown.  Northern gates and railings heavily corroded at fixings into stone.  Needs repointing, some brick replacement, removal of vegetation and capping re-setting.

 Survey Date: 26.05.2017

Boundary Wall and Gate piers at Honing House

red brick wall

Site Name: Boundary Wall and Gate piers at Honing House, Westgate

Parish: Southwell

Overall Condition: Poor

Risk Category: 3A

Details: Heavy amount of spalling to large sections of brickwork.  Mortar completely eroded in certain places, some movement.  Wrought iron gates in fair condition.

Survey Date: 26.05.2017

Boundary Wall and Gate piers at Sacrista Prebend

red brick wall

Site Name: Boundary Wall and Gate piers at Sacrista Prebend, Westgate

Parish: Southwell

Overall Condition: Poor

Risk Category: 3A

Details: Very heavy spalling of brickwork and deeply recessed pointing (some cement repointing).  Large crack running through the walls and one coping stone that appears to have been caused by tree behind wall pushing wall outwards as it has grown.  Wall appears to have been pinned.  Some water damage below gate pier capstones and both gate piers worn at the bases.  Quite a severe bow to the wall is present, quite possibly caused by adjacent tree.

Survey Date: 26.05.2017

Barns 50 metres North East of Bath Cottage

barn half behind tree, no door in upper doorway

Site Name: Barns 50 metres North East of Bath Cottage, Bath Lane

Parish: Southwell

Overall Condition: Poor

Risk Category: 3

Details: Barn appears to be in a semi ruinous state though still in some form of use as an outbuilding.  Windows are currently removed there is extensive damage to brickwork and the roof has various holes.

 Survey Date: 26.05.2017

Boundary Walls and Gate piers at 28 and 32, Westgate

gateway and wall

Site Name: Boundary Walls and Gate piers at 28 and 32, Westgate

Parish: Southwell

Overall Condition: Poor

Risk Category: 3A

Details: Wall – extensive wear of both mortar and blockwork.  Gate piers – In 2013 “Right hand ball finial is cracked and in a very poor condition.”  Now one pier removed completely probably to widen access to building site behind, other pier capstone and finial also removed.

Survey Date: 26.05.2017

Stable Range and attached Boundary Wall

Site Name: Stable Range and attached Boundary Wall 20 metres South East of Normanton Hall, Normanton Road

Parish: Southwell

Overall Condition: Poor

Risk Category: 3

Details: End gables on the road are covered with dry green algae. Northernmost gate pier: bricks shattered and loose at top of pier.  Some patches of cement mortar badly effecting bricks.

 Survey Date: 26.05.2017

Ice House

Site Name: Ice House Approximately 630 metres East of Norwood Park

Parish: Southwell

Overall Condition: Poor

Risk Category: 3A

Details: Barrel arch of entrance chamber has moved and the bricks are falling from the roof.  Large crack in RHS wall of entrance chamber.

Survey Date: 23.04.2014

Stable and Potting Sheds

Site Name: Stable and Potting Sheds 5 metres North of Easthorpe Lodge, Easthorpe

Parish: Southwell

Overall Condition: Poor

Risk Category: 3

Details: Front Elevation: Window frames rotten and no glazing, guttering full of vegetation.

 Survey Date: 26.05.2017

Cart shed 25 metres South West of Manor Farmhouse

open sided red brick building

Site Name: Cart shed 25 metres South West of Manor Farmhouse, Corkhill Lane

Parish: Southwell

Overall Condition: Poor

Risk Category: 3

Details: Open fronted 4 bay cart shed. Bay 1(left hand bay) closed off to rest of bays.  Large Buddleia growing in opening. Back wall very damp, algae growing.  Bays 2 and 3 algae and ferns growing out of inside of back wall – efflorescence.  Large weeds growing in these bays.  Bay 4 Large crack in back wall.  Pillars of archways that divide the bays – brickwork eroding.  No gutter present, only gutter support remain – but no signs that this is causing problems on the front elevation.

Survey Date: 26.05.2017

Boundary Wall and Gate piers at Rampton Prebend

red brick wall

Site Name: Boundary Wall and Gate piers at Rampton Prebend, Westgate

Parish: Southwell

Overall Condition: Poor

Risk Category: 3A

Details: Heavy spalling of brickwork and deeply recessed mortar, some concrete repointing.  Weathering of gate piers and signs of water damage at mortar joint between pier and cap stone.  Central pedestrian access the gate pier to the left of gate is concrete, to the right stone, both weathered (Lichen).  Gate piers to the vehicular access SW gate pier replaced (like for like) in new ashlar stone NE pier some erosion at the base but in good order.

 Survey Date: 26.05.2017

Boundary Wall and Gate piers at Dunham House

Site Name: Boundary Wall and Gate piers at Dunham House, Westgate

Parish: Southwell

Overall Condition: Poor

Risk Category: 3A

Details: Some corrosion of iron gate.  Right-hand cap stone to gate pier completely missing.  Heavy build-up of detritus with weathering of mortar and spalling of brickwork.

Survey Date: 26.05.2017

Gateway and Railings at Brackenhurst Hall

white wall, gate and building across a road

Site Name: Gateway and Railings at Brackenhurst Hall, Nottingham Road

Parish: Southwell

Overall Condition: Poor

Risk Category: 3A

Details: Lower walls overgrown with vegetation.  Coping on dwarf wall to left of gate has been smashed.  Gate and railings beginning to show signs of corrosion and neglect.

 Survey Date: 26.05.2017

Sundial 12 metres South of Church of All Saints

Site Name: Sundial 12 metres South of Church of All Saints, Church Street

Parish: Sutton on Trent

Overall Condition: Poor

Risk Category: 3A

Details: North Face: Flaking and eroded with lichen.  Inscription illegible.  East Face:  Flaking and erosion with lichen and repaired corner at top with visible inscription reading “B??LL”.  South Face:  Erosion and lichen.  Inscription reading “George”.  West Face:  Lichen, severe flaking and erosion, repair to top corner.  Inscription illegible.  Capstone of different stone with algae and replacement dial.

Survey Date: 15.06.2017

Group of Five Headstones Five metres South of Church of St Peter

row of five small rounded headstones in grass

Site Name: Group of Five Headstones Five metres South of Church of St Peter, Church Lane

Parish: Upton

Overall Condition: Poor

Risk Category: 3A 

Details: Inscriptions well preserved as stones are leaning with their faces down and protected. Substantial moss growth on the rear of the 3rd and 5th headstones from the church end of the row.  All have lichen.

Survey Date: 09.06.2017

Town Farmhouse and adjoining Cottages and Water Pump

red brick farmhouse with white door on gable end

Site Name: Town Farmhouse and adjoining Cottages and Water Pump, Main Road

Parish: Upton

Overall Condition: Poor

Risk Category: 3 

Details: Showing major signs of neglect.  Pump not accessible due to security fencing.  Ivy and climbing plants growing up both elevations, starting to cover windows and grow into gutters.  Ivy also growing inside. 

 Survey Date: 06.09.2017

Tomb Slab at East end of Church of St Swithin

white slab in front of two tombs with some weeds

Site Name: Tomb Slab at East end of Church of St Swithin, Potter Lane

Parish: Wellow

Overall Condition: Poor

Risk Category: 3A

Details: Moved from next to the wall to 3m east of chancel.  Stone badly eroded on the west face and flaking on the east face.  Its original position next to the wall is identifiable, where stone is cleaner in this position.

Survey Date: 18.07.2017

Ice House in Winkburn Park

Site Name: Ice House in Winkburn Park, Winkburn Lane

Parish: Winkburn

Overall Condition: Poor

Risk Category: 3A

Details: Brickwork opening in poor state, most of pointing missing to exposed areas of brickwork.  No door or grill covering  to ice house.  Photos taken from cemetery and field up to ice house. 

Survey Date: 08.03.2014

Thompson Tomb in Church of All Saints

Site Name: Thompson Tomb in Church of All Saints, Church Yard, 15 Feet South of Baptistery, Gainsborough Road

Parish: Winthorpe

Overall Condition: Poor

Risk Category: 3A

Details: Inscription is illegible on north and south sides.  Stem to urn is cracked – showing rusty iron cramp.  South eastern fluted shaft broken at the base.  Two capping stones capping the capitals are chipped.  Ball feet 1 intact, 1 in half, 2 missing and metal rod exposed and rusting.

Survey Date: 23.06.2017

District: Rushcliffe

Overall Condition: Very bad

Yew Tree Farmhouse and adjoining Garden Wall

Site Name: Yew Tree Farmhouse and adjoining Garden Wall, Main Street (NCC REF 8.22.1)

Parish: Hawsworth

Overall Condition: Very Bad

Risk Category: 1A (Garden Wall)

Details: Overall Condition and Risk Category due to condition of mud wall section of garden wall-  assessed in 2017.  

Survey Date: 2017

Old Lock River Soar

old grassed over lock

Site Name: Old Lock River Soar (NCC REF 8.26.17)

Parish: Kingston on Soar

Overall Condition: Very Bad

Risk Category: 1A

Details: Lock chamber filled in and grassed over.  Old lock gates decaying and rotten.  Evidence of lock walls on both sides but overgrown.  Steps visible and mooring posts.  

Survey Date: 17.10.2018

Pillboxes at Tollerton Airport

red pillar box in field between trees

Site Name: Pillboxes at Tollerton Airport (NCC REF 8.52.10)

Parish: Tollerton

Overall Condition: Very Bad

Risk Category: 1

Details: Substantial vertical crack through the middle of the south wall and through the roof slab.  Large Poplar trees planted at the corners.

 Survey Date: 19.09.2018

Church Site Farmhouse

Site Name: Church Site Farmhouse, Wymeswold Road (NCC REF 8.48.2)

Parish: Thorpe in the Glebe

Overall Condition: Very Bad

Risk Category: 1

Details: SW gable is coming away from the front elevation.  Quoins are also coming away.  Windows have worn paint and frames are rotting.  Some glazing bars missing from Yorkshire sash to the rear elevation.  Glazing missing some – boarded from the inside.  Evidence of brick and cement gap filling.

Survey Date: 06.09.2018  

Overall Condition: Poor

Boundary Walls and Water Pump

red brick wall

Site Name: Number 7 with adjoining Outbuilding, Boundary Walls and Water Pump, Church Street (NCC REF 8.3.1)

Parish: Bingham 

Overall Condition: Poor

Risk Category: 3A (Boundary Wall)

Details: Risk Cat 3A due to poor condition of  boundary walls and pump.  Boundary wall to road side has extreme lean (Mud section of wall assessed in 2015 as being in need of attention having been painted and having self set vegetation to the base of the wall).  Water pump has no timber casing to 2 sides, metal pump rusting.  House in fair condition.  Large unfinished hole in gable end above side door for waste pipe

Survey Date: 01.08.2018

The Manor House

red brick building with boarded windows

Site Name: The Manor House, 22, Market Place (NCC REF 8.3.18)

Parish: Bingham

Overall Condition: Poor

Risk Category:  3

Details: Upper left hand window is missing the cill.  Right-hand side boarding to window trapping water behind.  Vegetation to south gable end.  Air-brick blocked.  Attached building to north also vacant and boarded.

Survey Date: 03.07.2018

Cottage 12 metres South of the Radcliffe Arms

red brick building with steep roof,

Site Name: Cottage 12 metres South of the Radcliffe Arms, Loughborough Road
(NCC REF 8.5.14)

Parish: Bunny

Overall Condition: Poor

Risk Category: 3  

Details: Guttering broken, leading damp causing vegetation growth at bottom of the wall. Some broken bricks.  Chimney full of vegetation.  Salts to north elevation.

Survey Date: 05.07.2018

Group of Headstones Approx. 12m S of S Transept of Old Church of St Mary

group of dark headstones at angles

Site Name: Group of Headstones Approx. 12m S of S Transept of Old Church of St Mary, New Road
(NCC REF 8.8.12)

Parish: Colston Bassett

Overall Condition: Poor

Risk Category:  3A

Details: Headstone  6 is in poor condition with the stone splitting along top edge and down front face with an area of discolouration.  The other headstones are in fair condition but have incised marks from strimming.

Survey Date: 18.07.2018

Chest Tomb in Churchyard of Church of All Saints

large white decorated chest tomb

Site Name: Chest Tomb in Churchyard of Church of All Saints, 1.5m N of N Chapel, Church Lane
(NCC REF 8.10.5)

Parish: Cotgrave

Overall Condition: Poor

Risk Category:  3A

Details: Cap stone dislodged.  Panels to the long side have no plaques or legible inscriptions.  Plaques to the short ends are in fair condition. 

Survey Date:  09.07.2018

Headstones in Churchyard of Church of St Giles

damage to dark coloured headstone

Site Name: Headstones in Churchyard of Church of St Giles, North of Chancel, Fern Road
(NCC REF 8.11.6)

Parish: Cropwell Bishop

Overall Condition: Poor

Risk Category:  3A

Details: Middle headstone of the three is cracked with a large piece missing.

Survey Date: 11.07.2018

Garden House, Stable and Garden Wall

Site Name: Garden House, Stable and Garden Wall at the Hill, Kirk Hill
(NCC REF 8.13.7)

Parish: East Bridgford

Overall Condition: Poor

Risk Category:  3

Details:  Extensive unmanaged climbing vegetation to stepped gable end.  Large vertical stepped crack next to doorway.  Numerous tiles missing.  Rainwater goods missing or hanging off. Brickwork unsound especially to north gable of stable.  Loose, missing eroded and spalled bricks.  Wall to the west of the stable has been rebuilt.

Survey Date: 14.11.2018

The Hill, Kirk Hill

Site Name: The Hill, Kirk Hill (NCC REF 8.13.8)

Parish: East Bridgford

Overall Condition: Poor

Risk Category:  3

Details: Failing valley gutters to the roof.   Extensive cracking of render to the south elevation.  

Based on survey report by Staniforth Architects: Feb 2020.

Gateway to Former Elton Manor

red brick wall with notice board

Site Name: Gateway to Former Elton Manor, Sutton Lane
(NCC REF 8.16.6)

Parish: Elton-on-the-Hill

Overall Condition: Poor

Risk Category: 3A

Details: Wall has many large cracks and is leaning.  Base of brick pier is cracked through.  Top of pillar on gate was broken in 2 but was repaired in Oct 2018

Survey Date: 10.10.2018

The Aviaries & adjoining Garden Walls

Site Name: The Aviaries & adjoining Garden Walls, Flintham Hall
(NCC REF 8.18.14)

Parish: Flintham

Overall Condition: Poor

Risk Category:  3

Details: Stepped crack running through 18 courses of bricks to the interior of the west wall.  Ground level to the rear is covering the lower 6 courses of brick at the east end.  Damp behind downpipe, algae to rear wall.  Roof has extensive moss.  The doors to the individual aviaries are rusted and in very bad condition with mostly broken mesh.  Garden wall has gaps between the capping stones which is causing mortar to fail in the upper courses.

Survey Date: 21.12.2018

Garden House with adjoining Walls and Potting Sheds

Site Name: Garden House with adjoining Walls and Potting Sheds at Flintham Hall
(NCC REF 8.18.13)

Parish: Flintham

Overall Condition: Poor

Risk Category:  3

Details: Potting sheds – Gutters hanging off, causing severe damage to brickwork in these areas of the north wall.  Bricks missing and spalling.  Mature vegetation in the areas where the gutters and downpipes are failing.  Large plastic vent to one window of the north wall.  Some brickwork below easternmost window missing.  Large roof lights.  Erosion of some bricks and deeply recessed mortar to lower courses.  Garden House – Some minor brick spalling and evidence of repointing.  Front elevation inspected.

Survey Date: 21.12.2018 

Store at South Notts Bus Depot

Site Name: Store at South Notts Bus Depot, Leake Rd
(NCC REF 8.20.4)

Parish: Gotham 

Overall Condition: Poor

Risk Category:  3

Details: Exterior deteriorating as follows.  Large areas of render failing and exposed brick eroding and spalling.  Roof bowing.  Vegetation growing around base of wall.  Windows rusting.

Survey Date: 30.08.2018

Tapering Grave Slab in Churchyard of Church of All Saints

mostly ivy covered grave slave, arrow to uncovered corner

Site Name: Tapering Grave Slab in Churchyard of Church of All Saints South of Nave, Sutton Lane
(NCC REF 8.21.7)

Parish: Granby

Overall Condition: Poor

Risk Category: 3A 

Details: Almost completely covered in ivy.  Small section at E end visible and shows that the stone is eroding.

Survey Date: 16.08.2018 

Headstones in Churchyard of Church of St Luke

black headstone

Site Name: Headstones in Churchyard of Church of St Luke, S of S Aisle East of Porch, Main Street
(NCC REF 8.23.20)

Parish: Hickling

Overall Condition: Poor

Risk Category:  3

Details: No. 9 has a small section missing at the top.  10-16 third from right has fallen down, one next to this has part missing from bottom corner.

Survey Date: 11.07.2018

Grantham Canal

Site Name: Grantham Canal, 13 Miles Post Approximately 300 metres West of Main Street
(NCC REF 8.23.18)

Parish: Hickling

Overall Condition: Poor

Risk Category: 3A

Details: Horizontal crack running under the numbers.  Paint slip and open and metal rusting and flaking beneath the paint.  Sturdy in the ground.  Legible.  Paint peeling at the base to reveal blue undercoat.

Survey Date: 26.09.2018

Mann Tomb Chest 

plant covered tomb chest

Site Name: Mann Tomb Chest Immediately South West of Tower of Church of St Luke, Main Street
(NCC REF 8.23.12)

Parish: Hickling

Overall Condition: Poor

Risk Category: 3A

Details: Extensive unmanaged vegetation growth covering the top half of the tomb.  Ivy growing up from the base and algae growth.  

Survey Date: 11.07.2018

Frameknitter’s Workshop and Privies

Site Name: Frameknitter’s Workshop and Privies to Rear of Nos. 69-73, Nottingham Road
(NCC REF 8.25.71)

Parish: Keyworth

Overall Condition: Poor

Risk Category:  3

Details: Risk Cat related to the windows of the N elevation as a feature that is integral to the significance of this building.  The window frames to this elevation are almost entirely unglazed.  Some glazing bars are missing.  Corrugated metal sheeting boards the windows from the inside.  Paint has worn away revealing the timber which appears to be in repairable condition.  The doors to the ground floor do not have lintels and there is evidence of crude cement repointing over the doors and a stepped crack up to the windows.  

Survey Date: 30.08.2018

Pavilion in the Garden of Kingston Hall

mostly plant covered pavillion

Site Name: Pavilion in the Garden of Kingston Hall, Gotham Road
(NCC REF 8.26.5)

Parish: KIngston on Soar

Overall Condition: Poor

Risk Category:  3A

Details: Covered in climbing plant.  Only the NE and SE elevations visible and none of the roof due to the vegetation which is completely unmanaged.  Being used for storage.

Survey Date: 10.10.2018

Headstones in the Graveyard of the Former Church of St Wilfred

Site Name: Headstones in the Graveyard of the Former Church of St Wilfred Approximately 200 metres North of ‘Kinross’, Kinoulton Lane (NCC REF 8.27.8)

Parish: Kinoulton

Overall Condition: Poor

Risk Category:  3A

Details: Assessed in terms of the poorest condition stones.  Unkempt graveyard, animals must be grazing this area.  Some stones damaged and other severely leaning.

Survey Date: 08.08.2018 

Grantham Canal

red brick wall with dark brick line and corner of arch in bottom left

Site Name: Grantham Canal, Clarks Bridge (NCC REF 8.27.5)

Parish: Kinoulton

Overall Condition: Poor

Risk Category:  3A

Details: Four large cracks visible from beneath and above the parapet, from the coping stones of the parapet to half way down the arch. 

Survey Date: 17.10.2018 

Gateway and Walls to enclosure S of Langar Hall

Site Name: Gateway and Walls to enclosure S of Langar Hall btwn Churchyard and Cropwell Bishop Road (NCC REF 8.29.13)

Parish: Langar cum Barnstone

Overall Condition: Poor

Risk Category: 3A

Details: Top half of the ashlar gate piers are completely engulfed in tree and foliage.  Finials and moulded cornices are not visible.  Wall in fair condition but gate piers poor.  Section of wall behind tree in section containing the gate is severely eroded.

Survey Date: 16.08.2018

Crosland Chest Tomb

chest tomb covered mostly in plants

Site Name: Crosland Chest Tomb in Churchyard of Church of St Andrew Approximately 5 metres South of the West end of the Nave, Church Lane (NCC REF 8.29.10)

Parish: Langar cum Barnstone

Overall Condition: Poor

Risk Category: 3A

Details: Ivy covering tomb.

Survey Date: 12.07.2018

The Unicorns Head Public House

building with exposed roof beams and no tiles

Site Name: The Unicorns Head Public House, Main Street
(NCC REF 8.29.22)

Parish: Langar cum Barnstone

Overall Condition: Poor

Risk Category: 3

Details: Overall condition and Risk Category relate outbuilding that has no roof.

Survey Date: 12.07.2018 

Church of St Mary

pale stone church with crenulations and short tower

Site Name: Church of St Mary, Church Street (NCC REF 8.32.1)

Parish: Orston

Overall Condition: Poor

Risk Category: 3  

Details: Tower movement being monitored.

Survey Date: 05.07.018 

Headstones in Churchyard of Church of St Margaret

ivy covered headstone

Site Name: Headstones in Churchyard of Church of St Margaret, West of Tower, South Side, Church Lane (NCC REF 8.33.3)

Parish: Owthorpe

Overall Condition: Poor

Risk Category: 3A

Details: Headstones 13-16: Tree and ivy has overgrown the smaller headstone.

Survey Date: 09.07.2018

Wall, Railings and Gateways to Ruddington Free School

black iron railings in red brick wall with brick building behind

Site Name: Wall, Railings and Gateways to Ruddington Free School, The Green and Wall, Railings and Gateways to Ruddington Free School, Asher Lane (NCC REF 8.38.10)

Parish: Ruddington

Overall Condition: Poor

Risk Category: 3A

Details: Paint peeling off the gate & railings.  Bricks missing, spalling & deep mortar erosion to pier bases.  Coping stones eroded, with some railings exposed and extensive moss building up.

Survey Date: 04.07.2018

Ice House at Copper Top

Site Name: Ice House at Copper Top, Manor Park (NCC REF 8.38.18)

Parish: Ruddington

Overall Condition: Poor

Risk Category: 3A

Details: Inside walls are very damp and have algae and extensive efflorescence.  Top surface is covered with weed suppressant membrane.  Below ground cavity is infilled and capped with cement or possibly gypsum.  Well preserved superstructure and entrance.  Risk Cat due to condition of brick to the interior of passageway.

Survey Date: 06.09.2018

Greenhouse at Ruddington Golf Club

Site Name: Greenhouse at Ruddington Golf Club, Wilford Road (NCC REF 8.38.24)

Parish: Ruddington

Overall Condition: Poor

Risk Category: 3

Details: Many of the roof pains are broken.  Vegetation growing all round the building.

Survey Date: 04.07.2018

Boundary Wall and adjoining Stable at Church of St Wilfrid

ivy covered wall

Site Name: Boundary Wall and adjoining Stable at Church of St Wilfrid, Car Colston Road
(NCC REF 8.41.2)

Parish: Screveton

Overall Condition: Poor

Risk Category: 3A

Details: 3A due to poor condition of boundary wall.  Stable is maintained from the Rectory side but not being maintained from the churchyard side.  Boundary wall in poor condition and in is leaning in places.

Survey Date: 25.07.2018 

The Windmill, Shelford Road

round red brick building with no roof

Site Name: The Windmill, Shelford Road (NCC REF 8.42.10)

Parish: Shelford and Newton

Overall Condition: Poor

Risk Category: 3

Details: No roof or windows frames or glazing.  Vegetation growing out of middle of structure.

Survey Date: 06.07.2018 

Gateway and Walls about 20m N of Shelford Manor House

Site Name: Gateway and Walls about 20m N of Shelford Manor House, Manor Lane
(NCC REF 8.42.6)

Parish: Shelford and Newton 

Overall Condition: Poor

Risk Category: 3A

Details: 

Survey Date: 

Ice House at Manor Farmhouse

Site Name: Ice House at Manor Farmhouse, Main Street
(NCC REF 8.43.8)

Parish: Shelton

Overall Condition: Poor

Risk Category: 3A

Details: NE entrance wall has significant horizontal leading to a stepped crack and upper part of wall above this is leaning in.  SW entrance wall is missing bricks at either end.  Deteriorating.

Survey Date: 16.08.2018

Water Pump 12 metres West of Manor Farmhouse

Site Name: Water Pump 12 metres West of Manor Farmhouse, Main Street (NCC REF 8.43.7)

Parish: Shelton

Overall Condition: Poor

Risk Category: 3A

Details: Pump in similar condition to condition at listing but now missing the top flap.

Survey Date: 16.08.2018

Old Walling and Doorway in Garden of Number 6

garden with door way in overgrown wall

Site Name: Old Walling and Doorway in Garden of Number 6, Approximately 7 metres North East of the House, Park Lane
(NCC REF 8.47.23)

Parish: Sutton Bonnington

Overall Condition: Poor

Risk Category: 3A

Details: Completely covered in vegetation as in the listing photograph.  Not possible to assess the condition of the wall although clearly still standing.

Survey Date: 28.06.2018

Church of St Helena

grey church with tall pointed tower

Site Name: Church of St Helena, Church Lane (NCC REF 8.49.1)

Parish: Thoroton

Overall Condition: Very Bad

Risk Category: 3

Details: Very Bad in line with Historic England’s assessment of the risk of further rapid deterioration or loss of fabric with no solution.

Survey Date: 03.07.2018

Pillbox at Tollerton Airport (1)

gated entrance to red brick pillbox

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.6)

Parish: Tollerton

Overall Condition: Poor

Risk Category: 3

Details: Brick erosion and spalling with efflorescence through mortar.  Interior full of stagnant water with algae on the surface.  Rusted gate.  Possible public safety issue with open steps and standing water in the base.

Survey Date: 09.09.2018 

Pillbox at Tollerton Airport (2)

long cylinder with arrow pointing to central area

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.8)

Parish: Tollerton

Overall Condition: Poor

Risk Category: 3

Details: Partial survey of east elevation and roof.  Surrounded by mature vegetation.

Survey Date: 19.09.2018

Pillbox at Tollerton Airport (3)

pillbox in front of tall trees

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.12)

Parish: Tollerton

Overall Condition: Poor

Risk Category: 3

Details: South and west elevations surveyed.  Substantial vertical crack through wall and roof slab and window.  Large Poplar trees planted at the corners, probably the cause of the structural problems.

Survey Date: 19.09.2018 

Pillbox at Tollerton Airport (4)

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.16)

Parish: Tollerton

Overall Condition: Poor

Risk Category: 3

Details: Not Located, possibly covered in vegetation.  Not clearly visible from the airport side.

Survey Date: 19.09.2018

Pillbox at Tollerton Airport (5)

overgrown pillbox with grass growing from roof

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.18)

Parish: Tollerton

Overall Condition: Poor

Risk Category: 3

Details: Lack of management of vegetation.  Upper courses of bricks missing and loose bricks present around window lintels.  Extensive vegetation to roof.

Survey Date: 19.09.2018

Pillbox at Tollerton Airport (6)

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.19)

Parish: Tollerton

Overall Condition: Poor

Risk Category: 3

Details: Substantial vertical crack to the NW corner which continues through roof slab.  Extensive severe brick erosion and spalling.  Mature vegetation to entrances.

Survey Date: 19.09.2018

Pillbox at Tollerton Airport (7)

pillbox surrounded by bushes

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.21)

Parish: Tollerton

Overall Condition: Poor

Risk Category: 3

Details: Lack of management of vegetation.  Not accessible, not visible as in centre of mature vegetation. 

Survey Date: 19.09.2018 

Pillbox at Tollerton Airport (8)

pillbox in field

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.22)

Parish: Tollerton

Overall Condition: Poor

Risk Category: 3

Details: Missing upper courses of brick cladding, with grasses growing from walls.  Loose bricks to the top of remaining courses.  Brick skin to the entrance peeling away.

Survey Date: 19.09.2018

Pillbox at Tollerton Airport (9)

bushes in front of overgrown pillbox

Site Name: Pillbox at Tollerton Airport (NCC REF 8.52.23)

Parish: Tollerton

Overall Condition: Poor

Risk Category: 3

Details: Brick skin coming away.  Top courses of bricks missing and loose bricks to the top of the remaining courses.  Extensive soil and grass to the roof.  North elevation surveyed.

Survey Date: 19.09.2019

Old Trent Bridge Flood Arches

stone arches over water

Site Name: Old Trent Bridge Flood Arches, London Road
(NCC REF 8.54.5)

Parish: West Bridgford

Overall Condition: Poor

Risk Category: 3A

Details: Missing dressed stones to the south arch of the west face and the cutwater.  Some vegetation to east face and walkway arches.  Extensive vegetation to west face.

Survey Date: 07.12.2018

Headstone at Church of the Holy Rood

headstone leaning against stone wall

Site Name: Headstone 16 metres South of South Aisle at Church of the Holy Rood, Village St
(NCC REF 8.54.16)

Parish: West Bridgford

Overall Condition: Poor

Risk Category: 3A

Details: Headstone has been removed from the ground and is leaning against the church wall.

Survey Date: 24.07.2018 

Pair of Headstones at Church of the Holy Rood

two dark headstones leaning against red brick wall

Site Name: Pair of Headstones 10m & 12m S of S Aisle at Church of the Holy Rood, Village St
(NCC REF 8.54.17)

Parish: West Bridgford

Overall Condition: Poor

Risk Category: 3A

Details:  Both headstones have been removed from the ground and are leaning against the church wall.

Survey Date: 26.07.2018 

Sundial in Churchyard of Church of St Helen

Site Name: Sundial in Churchyard of Church of St Helen, Single metre South of the Chancel, Main Street
(NCC REF 8.55.4)

Parish: West Leake

Overall Condition: Poor

Risk Category: 3A

Details:  Missing

Survey Date: 16.07.2018

Boundary Wall at Church of St John of Beverley

red wall, white lower down, some ivy

Site Name: Boundary Wall at Church of St John of Beverley, to Church Street and Church Walk
(NCC REF 8.56.2)

Parish: Whatton in the Vale

Overall Condition: Poor

Risk Category: 3A

Details: Large crack and bulge to wall with some fallen stone work to the ground below.  Corner stone pier (left hand side end of wall) signs of damage.  Coping stones not secure to wall (in sections down Church Walk).  Extensive cracking alongside wall (Church Walk) possibly caused by tree roots.  Ivy growing through crack and wall bulging.

Survey Date: 06.07.2018

District: Gedling

Overall Condition: Poor

Boundary Wall, Piers and Gate at Bestwood Pumping Station

wall with leaf litter and tree

Site Name: Boundary Wall, Piers and Gate at Bestwood Pumping Station, Mansfield Road
(NCC REF 7.2.12)

Parish: Bestwood St. Albans

Overall Condition: Poor

Risk Category: 3A

Details:  Lower half of wall is damp and has ferns and algae growing.  Survey nail in stone.  One coping stone damaged.  Significant moss coverage at south end.  Gate piers – section have shifted out of line and capital is misaligned.  Small section of molded column decoration has been removed.

Survey Date: 18.08.2017 

Spire Top

stone spire top - tall cone shape

Site Name: Spire Top One and a Half metres West of South Aisle at Church of St Helen, Church Road
(NCC REF 7.3.2)

Parish: Burton Joyce

Overall Condition: Poor

Risk Category: 3A

Details: Heavily weathered, stone has been eroded considerably.

Survey Date:  27.07.2017

Minta’s Printing Works

red brick building with white windows, car in front

Site Name: Minta’s Printing Works, Main Street (NCC REF 7.4.9)

Parish: Calverton

Overall Condition: Poor

Risk Category: 3

Details: Window grading given relates to first floor windows only (with the exception of one window on the ground floor east elevation) – windows are in a very poor condition with rotten casements. Heavy erosion to brickwork at street level (approx. 1m high). Large amount of ivy growing to the west elevation at first floor, into guttering and onto roof. 

Survey Date:  18.07.2017

Bonington House

three storey house with white stone detail and windows, short building on left

Site Name: Bonington House, 79, High Street (NCC REF 7.5.12)

Parish: Gedling

Overall Condition: Poor

Risk Category: 3

Details: Eaves cornice has evidence of water damage and decay to left corner and centre on east elevation. Several timber casements have rotten cills. Walls need repointing in places. Centre of roof on east elevation has water ingress down wall face causing weathering to stone lintel and cill to second floor window along with damage to eaves detail. Roof has areas of missing tiles. 

Survey Date:  21.07.2017

Number 21 and adjoining Outbuilding

Site Name: Number 21 and adjoining Outbuilding, Main Street
(NCC REF 7.7.18)

Parish: Linby

Overall Condition: Poor

Risk Category: 3 

Details: Patches of missing roof tiles at west elevation. Missing gutter to west elevation. Incorrect connection of gutters and downpipe at east elevation. Efflorescence at wall facing north elevation. Erosion and missing brickworks facing south elevation. Broken timber frame and glazing missing at the east elevation.

Survey Date: 07.07.2017

Barn, Stable and Cart Sheds

Site Name: Barn, Stable and Cart Sheds 100m N of Weir Mill Farmhouse, Quarry Lane
(NCC REF 7.7.26)

Parish: Linby

Overall Condition: Poor

Risk Category: 3

Details: Missing roof tiles facing west.  Vegetation in gutter.  Broken gutter and downpipe.  Vegetation growing at the step at gable at north-west corner.  Stepped crack along the mortar at gable at north-west corner.  Moss growing at the top of side wall at south side.  Extensive weathering found at the gable at the north and walls. 

Survey Date: 10.07.2017  

Bottom Cross

stone cross with stepped base and stairs to door below

Site Name: Bottom Cross, Main Street (NCC REF 7.7.17)

Parish: Linby

Overall Condition: Poor

Risk Category:  3A

Details: Signs of movement, stepped cracking along mortar at south elevation, monitoring of crack and level of cross required. The base shows evidence of having sunk in the area above the culvert.  A large horizontal mortar bed has opened up to the LHS of the culvert and other open joints are visible in this area and on the west elevation of the cross base.  The metal band supporting the front edge of the cross base above the culvert is very corroded and there are signs (loose masonry) that the culvert side walls have eroded excessively and the culvert roof/cross plinth  underside looks to have moved (evidenced by an open joint and slightly misaligned stone).   Cement mortar pointing to plinth is of unknown date, cracked in places and visually inappropriate.

Survey Date:  07.07.2017  

Female Satyr Statue

Site Name: Female Satyr Statue 100 metres East of Newstead Abbey
(NCC REF 7.8.15)

Parish: Newstead

Overall Condition: Poor

Risk Category: 3A

Details: Statue is missing infant. Base of statue has been replaced – was originally circular, is now square. Pedestal has areas of spalling with missing stone (west and south elevation).  Lead statue has numerous articles of graffiti engraved into figure.

Survey Date:  12.07.2017

Newstead Abbey and adjoining Boundary Wall

elaborate abbey across a body of water

Site Name: Newstead Abbey and adjoining Boundary Wall
(NCC REF 7.8.3)

Parish: Newstead

Overall Condition: Poor

Risk Category: 3

Details: Rainwater down pipe facing north exposed due to paint peeling off, repainting required; new lead fixings to rainwater downpipe are overlapping the original fixings to the wall. Areas of eroded stonework, particularly the arches and hood moulds. Stepped crack along mortar on the south elevation of west wing.  West gable of Priory Church at the northwest corner is fenced off, and has some areas of vegetation growing facing east. Boundary wall at northwest corner – areas of erosion and vegetation growing, bottom of timber door damaged. 

Survey Date: 12.07.2017 

HE Update 2020: By 2018, the threat of falling stone fragments from the adjoining priory church ruin meant that this part of the site was not accessible to the public. Historic England awarded a two stage grant for project development and repair work in 2018. Repairs were due to complete in late 2019 but some work was postponed until spring 2020. Work restarted in May, following a Covid-19 delay, but should be complete in mid-2020.

Garden Walls, Seats and Tunnel

curved stone bench under trees

Site Name: Garden Walls, Seats and Tunnel to East of Newstead Abbey
(NCC REF 7.8.13)

Parish: Newstead

Overall Condition: Poor

Risk Category: 3A

Details:  Semi-circular seat to North West is under tree canopy with steps and base of seat suffering from permanent exposure to damp. Moss covering steps and bench of seat, and lichen largely covering all vertical elevations. Start of wall at North West is missing several stones. Large vegetation/tree seedling is growing up through top of the left hand gate pier, pushing and cracking coping stones. Further along the wall areas requires repointing, particularly by seat to North East. Missing coping stones to east wall. In tunnel area of bricks, approx. 1m² suffering from penetrating damp which has significantly eroded the bricks.

Survey Date:  12.07.2017

Railway Overbridge

stone wall of railways bridge as seen from below

Site Name: Railway Overbridge, Station Avenue (NCC REF 7.8.19)

Parish: Newstead

Overall Condition: Poor

Risk Category: 3A

Details: Top of bridge is very overgrown with trees growing in close proximity to bridge and ivy covering balustrade and wall at east elevation. Cast iron arch is eroded and rusted to underside. Stone piers are to south wall of tunnel have three areas of missing stone where drainage and downpipes have been installed and later removed.

Survey Date: 13.07.2017

Fountain in Cloister Garth

Site Name: Fountain in Cloister Garth at Newstead Abbey
(NCC REF 7.8.5)

Parish: Newstead

Overall Condition: Poor

Risk Category: 3A

Details: Vertical crack to round basin at east elevation. Architectural details are heavily weathered and in places have broken off completely – e.g. animal figures to top of fountain. One figure has been replaced. Fountain is not in operation. Coping stones to edge of fountain are weathered and eroded.

Survey Date: 12.07.2017 

Cascade and Pool

stone fountain in trees

Site Name: Cascade and Pool 20 metres North of Garden Wall at Newstead Abbey (NCC REF 7.8.14)

Parish: Newstead

Overall Condition: Poor

Risk Category: 3A

Details: Extensive vegetation and moss covering the steps of the fountain. Ivy growing through the wall of the cascade. Signs of weathering with some holes in stonework. Currently not in operation.

Survey Date: 12.07.2017  

The Cannon Fort and adjoining Dock

arches below walkway with castle-like top, body of water beyond

Site Name: The Cannon Fort and adjoining Dock (NCC REF 7.8.7)

Parish: Newstead

Overall Condition: Poor

Risk Category: 3A

Details: Also appears on HE at Risk Register. Area of missing coping stones to top of fort walls. Archway entrances to towers are damaged and weathered with missing stone. Walls have considerable amount of graffiti both engraved and sprayed. Small areas of vegetation growing to top of fort wall.

Survey Date:  12.07.2017

HE Update 2020: By 2018, though structurally sound, masonry repairs were needed and the adjacent dock area required clearing. Historic England awarded a grant for project development work in 2018 and, subsequently, funding for repairs. Masonry repairs undertaken in 2019 but some remedial work was postponed until spring 2020. Work re-started in May, after a Covid-19 delay and is due to complete by July.

Fountain

Site Name: Fountain 50 metres North East of Newstead Abbey (NCC REF 7.8.11)

Parish: Newstead

Overall Condition: Poor

Risk Category: 3A

Details: Extensive moss growth to the base and spout of fountain. Large areas of stone spalling to internal bowl. Stone figure to central spout is heavily weathered, losing details and has a broken limb. Fountain is not in use.

Survey Date: 12.07.2017

Boundary Stone to North of Papplewick Pumping Station

Site Name: Boundary Stone to North of Papplewick Pumping Station at SK 58357 52201, Longdale Lane (NCC REF 7.9.39)

Parish: Papplewick

Overall Condition: Poor

Risk Category: 3A

Details: The wall was built with a niche so that the front face of the boundary stone could still be seen through the wall, the niche is now bricked up.  The front face that faces the wall is well preserved and free from moss and largely free from lichen, but the other 3 faces have mature lichen growth and are covered in mature moss growth.

Survey Date: 22.09.2017

Boundary Wall and Gates at Papplewick Pumping Station

stone gateposts with large iron gates

Site Name: Boundary Wall and Gates at Papplewick Pumping Station, Longdale Lane

Parish: Papplewick

Overall Condition: Poor

Risk Category: 3A

Details:  Areas of heavy weathering. Mortar missing over an inch in depth in parts. Missing and crumbling bricks. Ironmongery is in good condition and has been recently painted. Stone piers – missing one leaf to corner of right pier at west elevation.

Survey Date:  05.04.2017

Gate Piers and Boundary Wall at Church of St James

wall leading to gate. trees behind

Site Name: Gate Piers and Boundary Wall at Church of St James, Church Lane
(NCC REF 7.9.8)

Parish: Papplewick

Overall Condition: Poor

Risk Category: 3A

Details: Cracks to piers with areas of crumbling stone. Adjacent trees growing in close proximity to pier – in danger of toppling over. Top of piers are very weathered and losing detail.  Gate requiring cleaning to remove algae.

Survey Date: 04.07.2017 

Boundary Stone at Entrance to Newstead Grange

Site Name: Boundary Stone at Entrance to Newstead Grange at SK 55276 52573, Blidworth Waye
(NCC REF 7.9.40)

Parish: Papplewick

Overall Condition: Poor

Risk Category: Severely weathered and inscription is illegible. Stone is sinking into the ground and listing to one side.

Details: Severely weathered and inscription is illegible. Stone is sinking into the ground and listing to one side.

Survey Date:  04.07.2017

East Lodge at Newstead Abbey

stone lodge with small conifers in front, trees behind

Site Name: East Lodge at Newstead Abbey, Mansfield Road
(NCC REF 7.8.1)

Parish: Ravenshead

Overall Condition: Poor

Risk Category: 3

Details: Valley’s and guttering blocked with growing vegetation and debris. Windows require repainting and resetting with putty in places. Stone mullions, jambs and hoods are heavily weathered in areas. Walls are showing signs of weathering and repointing is necessary in places. Stepped crack above window to gable on south elevation (approx. 1inch diameter). Architectural details such as date stones are becoming very weathered.

Survey Date: 12.07.2017  

Church of the Good Shepherd

flat-roof building with tall pointed structure on roof

Site Name: Church of the Good Shepherd,
Thackery’s Lane

Parish: Woodthorpe

Overall Condition: Poor

Risk Category: 

Details:  The church is suffering severe concrete decay problems requiring urgent specialist attention to avoid loss of historic fabric. An extensive programme of grant-assisted repairs, jointly funded by Historic England and National Lottery Heritage Fund, has successfully renewed complex roofing and ensured concrete facing panels are safe and weather tight. Further extensive repairs, possibly renewal, needed to mullions and glazing. Specialist advice is required. (HE 2020)

Survey Date:  HE 2020

District: Mansfield

Church of St. John the Evangelist

Site Name: Church of St. John the Evangelist, St. John Street

Parish: Mansfield

Overall Condition: Poor

Risk Category: 

Details:  Following completion of
development work, a National Lottery Heritage Fund
Grant for Places of Worship was awarded for repairs to
the nave roof in March 2016. The chancel and organ
chamber/vestry roof are suffering from nail fatigue and
there are several slipped slates and signs of water ingress
internally. The tower and spire are in need of urgent repair.
The structural integrity of the spire is of particular concern
and it is being monitored. (HE 2020)

Survey Date:  

flat-roof building with tall pointed structure on roof

Site Name: 

Parish: Mansfield

Overall Condition: …..

Risk Category: 

Details:  …….

Survey Date:  ……

Success Stories

Yew Tree Farmhouse

derelict building
white render, new windows and door, new roof building

Site Name: Yew Tree Farmhouse, Main Street

Parish: Kirton

Previously –
Overall Condition: Very Bad
Risk Category: 1
Details: Holes forming in roof, wall structure has been braced. Farm buildings in equally poor condition.
Date: 21.07.2017

00000tmp

UPDATE:
NCC Resurvey 02.03.2021
Overall Condition: Good
Risk Cat: 5
Details: Improvements  made under Planning App: 16/00407/LBC & 16/00406/FUL Appeared to be vacant at the time of survey but now has replacement pantile roof with a row of slate at the eaves.  Replacement timber door and timber casement windows.  Now re-rendered. 

Robin Hood Hotel

greenish building with boarded windows
workman on scaffolding in front of white building
red brick builing
02.03.2021

Site Name: Robin Hood Hotel

Parish: Newark

Previously
Overall Condition: Very Bad
Details: In a derelict state with mature vegetation growing out of the walls to the front and out of the eaves to the rear. Windows boarded and smashed where not fully covered.  Colourwash discoloured and peeling badly. Survey Date: 25.07.2017

NCC Resurvey 02.03.2021
Overall Condition: Good
Risk Cat: 5 
Vacant at time of survey. Improvements made.

Milestone to Left of Carriage Arch at Saracen’s Head Inn, Market Place

heavily corroded illegible milestone
new milestone "to London, 132 Miles"

SUCCESS STORY
Replacement stone erected.

Site Name: Milestone to Left of Carriage Arch at Saracen’s Head Inn, Market Place

Parish: Southwell

Overall Condition: Good

Risk Category: 5

Details: Stone is now badly eroded having disappeared completely in the bottom right hand corner with the brick wall behind now visible.  It is almost illegible with only ‘LON’ legible. (2017)

Survey Date: 26.05.2017

Entry Amended 02/02/2021

The Nags Head Inn

white pub with scaffolding
Grade II listed Nags Head Pub in 2017
red brick building
red brick building

Site Name: The Nags Head Inn, Old Great North Road

Parish: Sutton on Trent

Overall Condition: Poor

Risk Category: 3

Grade II listed Nags Head Pub in 2017
Vacant, in poor condition and ‘at risk’.

Details: Planning Permission PP-05340809 for conversion to 4 dwellings.  Lead flashing in valleys damaged, gutters with mature vegetation.  Chimney stack leaning.  Walls with damps patches, flaking paint and brick erosion.

 Survey Date: 15.06.2017

UPDATE

Resurveyed 2021. Listing removed from the At Risk Register.